Title Page
-
Location
-
Subdivsion ID number
-
Conducted on
-
Prepared by
Drainage
-
Is this a 173 agreement? (part construction)
-
Form work removed from all pits?
-
Pits rendered and flush where pipe enters pit? (check if gap under grates)
-
Correct size pits installed?
-
Correct pit covers installed?
-
Correct size pipes installed? Also in retention ?
-
Pits clean of debris and not holding water? (if holding water pipe could be blocked or at wrong level)
-
Step irons placed in pits? (if required) and at Correct spacings?
-
Have the pit lids been concreted in and bolted down?
-
Correct type of pipe installed? Concrete, recycled plastic.. etc
-
Are all pits and pipes installed at the correct location as per plans?
-
Orifice installed on water tanks?
-
Rain garden installed correctly? (if on plans)
-
Is the weir wall, trash grate, outlet and overflow gap installed in retention pit?
-
Are all the house drains connected to the drainage line?
-
Any soak-age or Atlantis cells installed? need photos of installation.....
-
Is the kerb adaptor installed correctly or drainage tap-in to existing pit satisfactory?
Concrete and other works
-
Driveway(s) poured ? and match level with pit lids
-
Is there any permeable pavement on site and installed as per plans
-
Does the footpath or kerb and channel need rectification?
-
Any signage or linemarking installed? as per plans
-
Any retaining walls installed? Concrete?
Overall completed
-
Is all drainage constructed as per plans?
-
Other information