Information

  • Document No.

  • Downer Traffic Management Quality Audit

  • Client

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Add location

Planning

  • Has a traffic control plan been provided? (Field guide or specific control plan)

  • Is the plan available for inspection?

  • Is the plan relevant to the work?

  • Are any required written authorisations/consents for speed limits in order- MOA ?

  • Are any changed to the plan documented and available for inspection?

  • Have roadwork speed limits been determined correctly?

  • Do persons onsite have a current ticket to implement signage and control traffic?

  • Have all persons been trained and signed onto the Traffic Management &Plant/Pedestrian interface SWMS?

  • Are the traffic controllers wearing the correct attire?

  • Are controllers receiving regular breaks? (3 hours max)

  • Are the traffic controllers in the best possible position and have suitable escape path?

  • Have provisions been made to supply and install aftercare signage on completion of work?

  • Are the signs in a serviceable condition? (Lettering is clearly visible, background of the sign is clean and not faded)

  • Are the communications between traffic controllers adequate?

  • Are the "END ROADWORK" signs installed where required?

  • Are stop/slow bats of the correct type and in good condition?

  • Comments

Advance warning - Signage

  • Are all roadwork signs and devices installed according to plan?

  • Have and contradictory, distracting signs/markings been covered up or removed?

  • Is signage suitable placed, especially for vehicles approaching at high speed?

  • Comments

Traffic Control

  • If traffic cones/bollards are used, are they the correct size and placed at 5 - 25 metre spacing?

  • If portable traffic signals are in use, are the time lapses between signals correct for the volume of traffic using that section of road? 4.7.2

  • Have side roads and private access points been adequately catered for? 2.4.1

  • Are "Traffic controller ahead / Prepare to stop" signs being removed when traffic controllers are not in attendance? 3.5.2

  • Are "Traffic controller ahead /Prepare to stop" signs located the required distance in advance of traffic controllers?

  • Are multi message signs being used correctly?

  • Are flashing arrow boards in use when required?

  • Comments

  • Are multi message signs being used correctly?

  • Comments

Temporary lighting

  • Comments

  • Are signs in pairs when needed? Recommended on high speed and volume roads and multi lane roads.

  • Is temporary lighting installed at the specified locations?

  • Is the temporary lighting installed correctly? (Not a glare problem for approaching motorists)

  • Comments

Pedestrian movements

  • Are suitably protected crossing points provided for pedestrians? 2.3.8

  • Are appropriate signs, barricades and warning lamps provided? 2.3.8

  • Is illumination adequate? 2.3.8

  • Are clearances between workers/pedestrians to adjacent traffic being maintained?

  • Has a containment fence been installed where required? (e.g pedestrians, cyclists, wheelchairs?)

  • Comments

Records

  • Are daily records kept detailing dates, all signs used, location and times etc? ITP.?

  • Comments

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.