Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
H&S
-
100.01 Vehicle parked correctly, not obstructing traffic or pedestrians
-
100.02 Correct PPE for tasks undertaken
Admin
-
101.06 Decision tree applied correctly for lead in method
-
101.07 Technical documents available for tasks undertaken
Customer Experience
-
103.02 Technician demonstrated service working
-
103.03 Customer kept informed during the process, including Fibre Install Contact Card left
-
103.04 Install method matches consent brief - customer informed
General Workmanship
-
104.02 Site tidy, no task waste
-
104.05 Completed installation is visually ok
Network Elements
-
105.10 Correct fibre/patch cord/splitter tail management. OFDF, FFP, FAT, ETP, ONT
-
105.11 Correct fibre splicing and connector hygiene/testing demonstrated. OFDF, FFP, FAT, ETP, ONT
-
105.12 Fixtures installed correctly. Internal and external. Pole, surface mount, ETP, ONT/ITP
-
105.13 FF/micro duct/hybrid installed correctly. Internal and external
-
105.14 Best practices undertaken in FFP, Flash 9 and FAT