Information
-
CSA
- CSA 01
- CSA 02
- CSA 03
- CSA03T
- CSA04
- CSA05
- CSA06
- CSA07
- CSA 08
- CSA09
- CSA10
- CSA11
-
Job ID
-
Job Source
-
Address
-
Audit date
-
Auditor
-
Auditee
Desktop checks
2.000 Handover & collateral delivered to Chorus
-
2.011 Inventory database updated
4.000 Code
-
4.004 Correct Statement of works codes used
Exchange checks
11.000 OFDF & exchange fibre
-
11.003 Network labelling correct at OFDF and log completed
-
11.004 Optical cables and cords adequately managed within racks and shelves
-
11.010 Protective caps on all unterminated connectors
-
11.011 Connectors cleaned and verified with fibre inspection probe
-
11.013 No fibre task waste, all optical (glass) ends safety contained
Field checks
25.000 Poles
-
25.010 Pole safe to climb (hammer, probe,dig)
-
25.012 Plant positioned correctly and safely, plant clearances correct
38.000 UFB fibre flexibility point (FFP)
-
38.017 All unused connectors capped
-
38.029 No fibre or task waste, all optical (glass) ends safely contained
-
38.030 Data card complete in pencil. ABF - micro duct number, splitter ID and splitter leg. FF - Splitter ID and splitter leg
-
38.034 Fibre secured in tube with strain bung
-
38.035 Allocated splitter leg routed over mandrel into correct tray position
-
38.036 FIP both LC connectors prior to connection
39.000 Aerial terminal/OFDC
-
39.004 Terminal lid secure
-
39.006 Lead-in entry correct
-
39.017 20mm or 32mm conduit secured to pole (wooden - galv saddles for white PVC pipe, plastic saddles for grey/beige 32mm HDPE pipe, secured with clouts or bandit straps)
42.000 Pedestal
-
42.004 PDS network labelled correctly (when housing a copper loop or other MDF customer feed)
-
42.008 Foam bung fitted/in correct position
-
42.015 Micro duct sheath opening 50mm above bung
-
42.024 Pedestal straight and secure
-
42.026 Micro duct connectors installed in vertical positions only
68.000 Fibre Access terminal
-
68.007 Silica gel pack installed/replaced
-
68.009 All latches are closed
-
68.010 O-ring installed
-
68.011 Fibre correctly managed within FAT and trays
-
68.013 Slack managed in fibre management coil (1.5 - 2m)
-
68.014 Swing arm and bracket in working order/or mounted on manufacturers bracket
-
68.015 Lid locked and lock bung installed
-
68.016 30mm bend radius unconditionally observed at all locations
-
68.018 Heat shrink splice protectors secured from movement
-
68.019 No fibre task waste, all optical (glass) ends safely contained
-
68.030 Fibre secured in tube with strain bung
69.000 Blown fibre boundary connection
-
69.001 1-way connected correctly
-
69.003 Cover board prior to reinstatement
74.000 Hand holes
-
74.001 Bedding done correctly and compacted
-
74.002 Hand hole locked, with lock facing the customer's boundary and openable
-
74.006 Lateral labelled and sealed, end cap and heat shrink
-
74.013 Customer's s/way duct managed round edge of hand hole
-
74.014 30mm bend radius unconditionally observed at all locations
-
74.016 Joint installed correctly between lateral and service lead
75.000 Ground level closure
-
75.002 Lid secure
-
75.003 Lid labelled
-
75.015 All micro ducts secured into management brackets
-
75.019 30mm bending radius unconditionally observed at all locations
-
75.022 Fibre routed and laid up correctly in trays
-
75.023 Fibre splice secured in tray holder
77.000 UFB Channell flash 9 installation
-
77.009 Locking collar secured with locking bolt. ID facing upwards
-
77.014 All 52x5mm micro ducts capped with duct end caps
-
77.017 Closure base 'O' ring clean, dry, undamaged and correctly seated. Spare 'O' ring in closure
-
77.026 Fibre routed and laid up in correct trays
-
77.059 No fibre task waste, all optical (glass) ends safely contained
78.000 Building distributor
-
78.056 Drop cable installed in the next available port in the wraparound seal
-
78.057 Cable sheath stripped back to the correct length
-
78.058 Foam tape is at end of the sheath opening and secured with a steel tipped zip tie
Customer Premise checks
43.000 Aerial Service lead
-
43.001 Correct service lead used
-
43.004 Correct fittings used and installed correctly (screw eyes, clamps, pole and buildings)
-
43.006 White pipe - only on poles, secured correctly
-
43.008 Roadway crossing at correct height
-
43.026 Correct procedure followed to extend 4/7 way up pole
44.000 Service lead
-
44.001 Service lead terminated correctly
-
44.008 White pipe above ground level
-
44.009 Depth correct
-
44.018 Decision tree applied for correct lead in method
-
44.019 Correct surface mount fastenings used/spacing to suit surface. Spacing max 600mm supported, 300mm unsupported
-
44.020 Copper locate installed with fixed fibre lead in if not installed with existing copper
45.000 ETP
-
45.018 correct ETP installed, tidily and securely
-
45.021 White pipe or flexi duct fitted to building secured and managed correctly
-
45.028 Heat shrink splice protectors secured from movement
-
45.030 No fibre or task waste, all optical (glass) ends safely contained
-
45.031 Gas block connector installed on the micro duct and locked
-
45.032 Sufficient metallic location element left for locate purposes
-
45.034 Micro duct held in position with zip tie or integrated saddle within ETP
-
45.035 Laser label positioned externally on the lid, supplied screw installed in bottom or front of ETP
-
45.036 Cable entry to building sealed
-
45.037 Unused copper pairs are capped with clearing connectors
-
45.039 Fibre managed correctly, length not excessive or causing unnecessary bends or stress
-
45.040 Min 5mm hybrid cable sheath inside ETP
46.000 Customer premises
-
46.001 Correct cable used, secured and tidy
-
46.003 Correct clearances observed
-
46.007 Jack point hardware installed correctly
-
46.014 Contractor appearance/manner/service completion card left (customer view)
-
46.016 Optical power meter test at the ONT prior to plugging in the SC/A connector, including FIP
-
46.017 Fibre/copper hybrid cable used
-
46.018 No fibre task waste on site, all optical(glass) ends safely contained
-
46.020 ONT installed and secured correctly, at least 300mm above floor. Pigtail secure
-
46.025 Min 10mm hybrid sable sheath inside ONT
-
46.026 ITP installed on hybrid copper cable at ONT and labelled correctly
47.000 Business premises
-
47.008 All ONTs labelled with SLID number - schools, commercial, locations with multiple services
General workmanship checks
6.000 Work areas and safety
-
6.014 Any defects to existing network outside of scope of project referred to be rectified in the future
-
6.016 Correct H&S practices observed
-
6.017 Network elements secured
72.000 Reinstatement
-
72.007 Excess vegetation removed
-
72.018 Ground reinstatement completed
73.000 Site tidy
-
73.010 Site tidy, no task waste - Customer premises
-
73.026 Site tidy, no task waste - Exchange
-
73.027 Site tidy, no task waste - Outside Plant