Information
-
Document No.
-
PROJECT NAME
-
AHB PROJECT NUMBER
-
Conducted on
-
Prepared by
-
Location
-
Personnel on worksite
AHB SUPERINTENDENT
PERSONAL PROTECTIVE EQUIPMENT
-
Hard hats (with bills forward)
-
Safety glasses appropriate for conditions (tinted or clear)
-
Hard toe work boots
-
Reflective vests
-
Gloves
-
Hearing protection if required
-
Face shields for cutting or grinding
HOUSEKEEPING
-
General site storage and housekeeping
-
Trash cans in work area
-
Spoil piles maintained
-
Storage / Dog House orderly
-
Safe walkways or passages
TEMPORARY BARRICADES
-
Proper tape used (red for danger, yellow for caution)
-
All sides of work area barricaded and labeled
LADDERS AND ELEVATED WORK
-
Ladders tied off
-
Ladder extended 3'
-
Inspected and tagged
-
Components undamaged
-
Handrail in place
FALL PROTECTION
-
Harness and lanyards used
-
Harness and lanyards inspected and within useable life
-
Hole protection used during work hours
-
Proper hole protection used after hours
MOBILE EQUIPMENT
-
Equipment inspected prior to initial use each shift
-
Seatbelts used
-
Workers trained
-
Annual inspections as required
-
Backup alarms working
-
Spotters used when needed
-
Equipment maintained without leaks
-
Safety guards and covers in place
-
Whip-checks used on pressurized lines
-
Spill kits available
HOISTING AND RIGGING EQUIPMENT
-
Daily crane inspection performed
-
Annual inspection placard and operators manuals available
-
Proper rigging and techniques used
-
Sling/chokers properly stored
-
Slings/chokers inspected
-
Qualified rigger named
-
Safety latch on hook checked
-
Workers staying clear of suspended loads
-
Knowledge of crane signals
-
Proper use of tag lines on suspended loads
-
Swing protection in place
EXCAVATION
-
Shaft stability measures properly used (casing, fluid level maintained, drill mud within specs, etc)
-
Spin off area maintained
-
Equipment staged a safe distance away overnight
-
Workers trained
REBAR PLACEMENT
-
Lifting plan properly planned, communicated and managed by a designated lift supervisor
-
Cage properly prepared with #9 wire and clamps
-
Cage properly rigged for lifting
-
Cage lifted and secured in shaft safely
CONCRETE OPERATIONS
-
Concrete pump and hoses used properly
-
Slick lines and hoses properly clamped with safety wire
-
Concrete washed from skin contact
PREWORK
-
Weekly Toolbox Talks are relevant to the Project, and sign-in sheets are submitted
-
Safe Work Plan was communicated to all workers on the project for tasks performed
-
MSDS for all chemicals on the project are available upon request
-
Supervisors are aware of local first-aid and hospital facilities
-
All required jobsite work permits, hot work permits, excavation permits, etc are obtained and dated properly.
-
Underground locates are in place and current
-
First Aid Kit is on site, in a sanitary condition and available for all workers on the Project
-
Employee training records are available for work being performed
REPRIMANDS OR WARNINGS
-
We're any reprimands issued?
-
We're any verbals warnings or directives given?
-
Was any Stop Work order issued?
COMMENTS
-
Add media
INSPECTION PERFORMED BY:
-
Add signature