Title Page

  • Conducted on

  • Prepared by

  • Location
  • Select date

  • Add location
  • Has the non return valve been installed on the new internal mains cold water supply to the pump panel?

  • Non Return Valve picture

  • Has the isolation valve been installed on the new internal mains cold water supply to the pump panel?

  • Isolation valve picture

  • Is the new internal/external mains cold water pipework to the pump panel adequately supported along its length?

  • Internal pipework support picture

  • Is the new external water pipework from the pump panel to the chiller(s) adequately supported along its length

  • External pipework support picutre

  • Has the external mains cold water pipework been insulated?

  • Pipework insulation picture

  • Has the new MCB in the distribution board been labelled (not hand written)?

  • MCB label picture

  • Have the UV Bulb details been recorded on the bulb matrix

  • UV Bulb details/Matrix - Picture

  • Is the bulb matrix affixed inside of panel?

  • Bulb matrix picture

  • Is the pump panel fitted correctly and adequately supported?

  • Panel picture

  • Is the cable to the pump panel adequately supported?

  • Cable support picture

  • Has the pump panel electrical isolator been installed?

  • Panel electrical isolator picture

  • Has fire sealant been used where pipework/cable penetrates a fire compartment?

  • Fire sealant picture

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.