Summary
-
Conducted on
-
Site ID
-
Engineer name
-
Location
Work Report
-
Work Completed Today
-
Work Left To Do
-
Ground level works
-
Materials Missing
-
Any other info (such as parking , SP issues, Test Kit, access, reasons for delay etc)
-
Walk away photos showing site safe and secure including materials If left secured on site
-
Informed BM?
-
Times site was locked and unlocked with screenshot from phone
-
Good call/close call
-
Attach Pictures
-
Attach Partial HOP