Title Page
-
Site
-
Erf Number
-
Started on
-
Inspected by
-
Subcontractor
-
Foreman
-
Works Certified
-
Completed on
Pre Works Checks:
-
Datum level confirmed
-
Top soil stripped
Setting out:
-
Corner points set out
-
Reference (offset) profile
-
Set out levels
-
Determine excavation or filling
Platform:
-
DCP test done and approved by engineer
-
Platform done to correct level
-
Fillng done in X mm layers per spec
General:
-
HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!
-
REQUIRED PPE
-
SAFETY FILE UP TO DATE
Approvals:
-
ENGINEER SIGNATURE
-
SUBCONTRACTOR SIGNATURE
-
FOREMAN SIGNATURE