Title Page

  • Site

  • Started on

  • Inspected by

  • Subcontractor

  • Foreman

  • Work Certified

  • Cpompleted on

PRE WORK CHECKS:

  • SITE TOP SOIL STRIPED

  • SURVEYOR PEG SET OUT

  • SITE CLEAN

SETTING OUT:

  • REFFERANCE PEGS SET OUT

  • TRENCH WITHS ACCORDING TO DRAWING

  • TOP OF CONCTRET PEGS

  • CONCTRETE DEPTH

TRENCHING:

  • TRENCHES CORRECT WITH

  • TRENCHES SIDES AND CORNERS CUT STRAIGHT

  • TRENCHES DEPTH CORRECT

STEEL REINFORCING:

  • REINFORCING ACCORDING TO SCHEDULES

  • ADEQUATE SPACERS UNDER REINFORCING

  • ADEQUATE SPACING BETWEEN REINFORCING AND SIDEWALLS OF TRENCHES

  • ENGINEER INSPECTION DONE

CONCRETE:

  • BUILDING INSPECTOR APPROVED

  • CONCRETE STRENGTH ACCORDING TO SPEC:

  • TOP OF CONCTRET LEVELS AND FINISH SATISFACTORY

  • TEST QUBES FOR CONCRETE TESTS DONE AS PER SPEC

GENERAL:

  • HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!

  • REQUIRED PPE

  • SAFETY FILE UP TO DATE

APPROVALS:

  • ENGINEER SIGNATURE

  • BUILDING INSPECTOR SIGNATURE

  • SUBCONTRACTOR SIGNATURE

  • FOREMAN SIGNATURE

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.