Title Page
-
Site
-
Started on
-
Inspected by
-
Subcontractor
-
Foreman
-
Work Certified
-
Cpompleted on
PRE WORK CHECKS:
-
SITE TOP SOIL STRIPED
-
SURVEYOR PEG SET OUT
-
SITE CLEAN
SETTING OUT:
-
REFFERANCE PEGS SET OUT
-
TRENCH WITHS ACCORDING TO DRAWING
-
TOP OF CONCTRET PEGS
-
CONCTRETE DEPTH
TRENCHING:
-
TRENCHES CORRECT WITH
-
TRENCHES SIDES AND CORNERS CUT STRAIGHT
-
TRENCHES DEPTH CORRECT
STEEL REINFORCING:
-
REINFORCING ACCORDING TO SCHEDULES
-
ADEQUATE SPACERS UNDER REINFORCING
-
ADEQUATE SPACING BETWEEN REINFORCING AND SIDEWALLS OF TRENCHES
-
ENGINEER INSPECTION DONE
CONCRETE:
-
BUILDING INSPECTOR APPROVED
-
CONCRETE STRENGTH ACCORDING TO SPEC:
-
TOP OF CONCTRET LEVELS AND FINISH SATISFACTORY
-
TEST QUBES FOR CONCRETE TESTS DONE AS PER SPEC
GENERAL:
-
HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!
-
REQUIRED PPE
-
SAFETY FILE UP TO DATE
APPROVALS:
-
ENGINEER SIGNATURE
-
BUILDING INSPECTOR SIGNATURE
-
SUBCONTRACTOR SIGNATURE
-
FOREMAN SIGNATURE