Title Page
-
Site
-
Started on
-
Inspected by
-
Subcontractor
-
Foreman
-
Work Certified
-
Completed on
PRE WORK CHECKS:
-
APPROVED (MIN A3) DRAWING HANDED OVER TO CONTRACTOR
-
ALL SIZES ON DRAWINGS COMPLETE
-
IS FOUNDATION LEVEL
-
FOUNDATION DIMENSIONS CORRECT AND SQUARE
-
ESTABLISH LINTEL HIGHT
-
ESTABLISH WALLPLATE HIGHT
-
DOOR AND WINDOW POSITIONS
-
DOOR AND WINDOW SIZES
-
POCKETS FOR CONCRETE, STEEL OR WOOD BEAMS
-
WEEPHOLE POSITIONS
-
SITE CLEAN
SETTING OUT:
-
BUILDING DIMENTIONS CORRECT
-
WALL WIDTHS
-
ELECTRICAL & PLUMBING CONDUITS & PIPWORK POSITIONS CORRECT
-
DOOR AND WINDOW POSITIONS
-
DOOR AND WINDOW SIZES
BRICKWORK
-
Brickwork as per drawing
-
STEP DPC CORRECT
-
DOORFRAMES SQUARE,PLUMB, LEVEL & HEIGHT
-
WINDOW SIDE & TOP DPC CORRECT
-
WINDOW CILL DETAIL CORRECT
-
BRICKFORCE EVERY 4TH COURSE
-
BRICKFORCE EVERY COURSE FOR 4 COURSES ABOVE LINTELS
-
ADEQUATE WALL TIES
-
PIPS FILLED
-
JOINTS FILLED
-
NO ELECTRICAL & PLUMBING CONDUITS & PIPE WORK DAMAGED
-
CAVITIES CLEAN
-
LINTEL HEIGHTS CORRECT
-
WALLPLATE / SLAB LEVELS CORRECT
-
TRUSS FIXING AT CORRECT SPACING
GENERAL
-
HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!
-
REQUIRED PPE
-
SAFETY FILE UP TO DATE
APPROVALS
-
SUBCONTRACTOR SIGNATURE
-
FOREMAN SIGNATURE