FLOOR FIX PRE WORK CHECKS
-
APPROVED (A3 MIN) DRAWING ON SITE
-
SITE CLEAN
FLOOR FIX INSTALATION
-
CORRECT PIPE TO POINT
-
PIPE ON CORRECT POSITION ACORDING TO DRAWING
-
ADAQUITE FALLS FOR WASTE & SEWER PIPES
-
PIPE SECURED AND BLOCKED OFF FOR CONCRETE POUR
-
TO BE PRESENT WITH POUR ON DATE:
GENERAL
-
HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!
-
REQUIRED PPE
-
SAFETY FILE UP TO DATE