Title Page
-
Site
-
Started on
-
Inspected by
-
Subcontractor
-
Foreman
-
Works Certified
-
Completed on
1ST FIX PRE WORKS CHECKS
-
DETERMINE FINAL FLOOR LEVEL (FFL)
-
DETERMINE TAPS, VALVES AND ROSE LEVELS FROM FFL
-
SET OUT AND MARK POSITIONS OF PIPES, TAPS AND VALEVES BEFORE CHASE WORK
-
SITE CLEAN
1ST FIX INSTALATION
-
ADEQUATE DEPTH (25MM MAX) AND WITH FOR CHASE WORK
-
ADEQUATE PIPEWORK
-
PIPEWORK DONE AS PER MARKINGS
-
ADEQUATE FIXINGS FOR PIPEWORK IN SCREEDS
-
PRESSURE TESTED
GENERAL
-
HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!
-
REQUIRED PPE
-
SAFETY FILE UP TO DATE
APPROVALS
-
PLUMBING INSPECTOR SIGNATURE
-
SUBCONTRACTOR SIGNATURE
-
FOREMAN SIGNATURE