Title Page

  • Site

  • Started on

  • Inspected by

  • Subcontractor

  • Foreman

  • Works Certified

  • Completed on

1ST FIX PRE WORKS CHECKS

  • DETERMINE FINAL FLOOR LEVEL (FFL)

  • DETERMINE PLUG AND SWITCH LEVEL FROM FFL

  • SET OUT AND MARK POSITIONS OF CONDUITS, PLUG AND SWITCHES BEFORE CHASE WORK

  • SITE CLEAN

1ST FIX INSTALATION

  • ADEQUATE DEPTH AND WITH FOR CHASE WORK

  • ADEQUATE PIPEWORK

  • PIPEWORK DONE AS PER MARKINGS

  • CORRECT SWITCH AND PLUG BOXES USED

  • PLUG ANS SWITCH BOXES CORRECT LEVEL FROM FFL

  • PLUG ANS SWITCH BOXES LEVEL AND PLUMB

  • PLUG ANS SWITCH BOXES SECURED AND COVERED FOR PLASTER WORK

  • ADEQUATE FIXINGS FOR PIPEWORK IN SCREEDS

  • TUBING DONE ON INACCESSIBLE ROOF SPACES

GENERAL

  • HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!

  • REQUIRED PPE

  • SAFETY FILE UP TO DATE

APPROVALS

  • SUBCONTRACTOR SIGNATURE

  • FOREMAN SIGNATURE

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.