Title Page
-
Site
-
Started on
-
Inspected by
-
Subcontractor
-
Foreman
-
Works Certified
-
Completed on
2ND FIX PRE WORK CHECKS
-
PAINTWORK 2ND COAT DONE
-
DETERMINE LIGHT POSITIONS AS PER DRAWINGS
-
SET OUT AND MARK LIGHT POSITIONS AS PER DRAWING
-
SITE CLEAN
2ND FIX INSTALATION
-
CUTTING/HOLES IN CEILINGS FOR LIGHTS AS PER MARKINGS
-
WIRING AS PER DRAWING
-
DRAW WIRES WHERE NEEDED
GENERAL
-
HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!
-
REQUIRED PPE
-
SAFETY FILE UP TO DATE
APPROVALS
-
SUBCONTRACTOR SIGNATURE
-
FOREMAN SIGNATURE