Title Page
-
Site conducted
-
Rockpanel cladding panels
-
C1214 Premier Inn Milton Keynes
-
Conducted on
-
Prepared by Jonathon A Young
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Rock panel Cladding Panel Installation
-
Project Number: C1214
-
Issued to:
-
QA Sheet No: 021
-
Elevation: South Elevation
-
Level:
-
Comments:
Rockpanel Cladding Panels
-
Rockpanel cladding panels delivered undamaged and packed with protection around them.
-
Personnel
- Installer
- A2O
Pre-installation
-
All background has been checked and signed off by the installer, A2O manager and the main contractor.
-
All installation operatives have been<br>briefed on the specific installation of<br>the Rockpanel cladding panels being installed, in<br>accordance with manufacturers<br>recommendation.
-
Personnel
Rockpanel cladding panel installation
-
Check Rockpanel cladding panel locations are in<br>accordance with A2O setting out construction drawings.
-
Personnel
- Installer
- A2O
-
Once the cladding panels have been installed, fixings checked cleaned down, they can then be handed over and signed off by the installer, A2O manager and the main contractor.
-
Personnel
- Installer
- A2O
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: