Title Page

  • C1218 Sixty 8 At The Marina

  • Conducted on

  • Prepared by

  • Location

Untitled Page

undefined

  • Make sure that the flue has been sealed to the new Y wall board using fire mastic.

undefined

  • Install SFS trimmers to the SFS studs as per A2O drawing 0135

  • Full fill around the flue pipe with Siderise full fill fire stop RVG-90/60

  • Instructions
    -------------------
    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link

  • Installer Signature:

  • A2O Signature:

  • Client Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.