Title Page
-
C1218 Sixty 8 At The Marina
-
Conducted on
-
Prepared by
-
Location
Untitled Page
undefined
-
Make sure that the flue has been sealed to the new Y wall board using fire mastic.
undefined
-
Install SFS trimmers to the SFS studs as per A2O drawing 0135
-
Full fill around the flue pipe with Siderise full fill fire stop RVG-90/60
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link -
Installer Signature:
-
A2O Signature:
-
Client Signature: