Title Page
-
C1218 Sixty 8 At The Marina
-
Conducted on
-
Prepared by
-
Location
Untitled Page
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Cladding Panel Background
-
Main Contractor: A2O Group
-
Project Number: C1218
-
Issued to: Cummings Group
-
QA Sheet No:
-
Comments:
Removal of existing cladding, including CP board to expose SFS or Concrete
-
All existing cladding to be removed including CP board to expose SFS. Install new Rockwool Flex Slab fully filled leaving no gaps.
-
Personnel
- Installer
- A2O
Install new Y Wall
-
Y Wall board to be installed following the manufacturers install guide, fixings to be installed following install guide. All joints need to be sealed with fire mastic, DAFA tape and then primer over the top of the tape.
-
Personnel
- Installer
- A2O
-
EPDM sealing windows to Y-Wall boards. Installed following the manufacturers install guide.
-
Personnel
- Installer
- A2O
Top hat, helping hand brackets, rails and Channels.
-
C Channels, brackets and rails are to be set out following A2O construction issue drawings. Fixings used must be on the fixing schedule.
Siderise Fire Barriers
-
Fire barriers must be installed following Siderise installation guide. It will be fixed using the fixing specified on A2O fixing schedule. All operatives installing fire barriers must be Siderise trained.
-
Personnel
Rockwool Duo Slab Insulation
-
Install Rockwool Insulation following the Rockwool installation guide following the fixing pattern and using the correct fixings specified on the A2O fixing schedule.
-
Area left clean and tidy
-
Personnel
- Installer
- A2O
Hardiplank VL Cladding.
-
Rockpanel to be installed following A2O location and detail drawings and also following the manufacturers install guide. Fixings used must be on the A2O fixing schedule.
-
Installer Signature:
-
A2O Signature:
-
Client Signature: