Title Page

  • Site conducted

  • Audit Title

  • Project Name

  • Conducted on

  • Prepared by

  • Location
  • Instructions
    -------------------
    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link

Structural Framing System

  • Main Contractor:

  • Project Number:

  • Issued to:

  • QA Sheet No:

  • Elevation:

  • Level:

  • Comments:

STRUCTURE

  • Primary Structure handover complete.

  • Personnel

BASE AND HEAD TRACK

  • Base & Head Track: Steel gauge in accordance with A2O working drawings

  • Personnel

  • Base & Head Track fixed to concrete/steel in accordance with A2O working drawings.

  • Personnel

GENERAL STUD

  • General Stud: Steel gauge in accordance with A2O Drawings

  • Personnel

  • Head Detail: Stud to be fixed to head track to facilitate structure deflection in accordance with A2O working drawings.

  • Personnel

  • Base Detail: Stud to be fixed to base track in accordance with A2O workding drawings.

  • Personnel

JAMBS/CILLS/LINTELS/NOGINS

  • Jamb/Cill/Lintel: Steel gauge/sizes in accordance with A2O working drawings.

  • Personnel

  • Single/Compound Jamb: Fixings at head and base in accordance with SFS Standard Details. Extra fixing may be required at jamb studs/track. Refer to project-specific A2O details.

  • Personnel

  • Single/Compound Cill/Lintel: Fixings at jamb in accordance with SFS Standard Details. Extra fixing/angle may be required at jamb studs. Refer to A2O working

  • Personnel

  • Compound Jamb/cill/Lintel: Boxed sections to be filled with Infill Insulation

  • Personnel

  • Nogins/Blocking installed in accordance with A2O drawings.

  • Personnel

Cement Particle Board

  • Confirm 12mm Versaliner SF board is being used as A2O drawings.

  • Personnel

  • Versaliner board fixings to SFS to be at maximum 600mm centres.

  • Personnel

  • Joints in boards sealed with versa sealer and foil tape.

  • Personnel

Completion

  • Installer Signature:

  • A2O Signature:

  • Client Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.