Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Versapanel
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
STRUCTURE
-
SFS area + QA complete.
-
Personnel
- Installer
- A2O
Versapanel
-
Confirm 12mm versapanel board is being used as per A2O drawings.
-
Personnel
- Installer
- A2O
-
Versapanel board fixings to SFS to be at maximum 600mm centres horizontally and 300mm centres vertically as per manufacturers install guide.
-
Personnel
-
3-6mm joints on boards.
-
Personnel
- Installer
- A2O
-
Movement joints left between boards at slab level.
-
Personnel
-
Joints taped continuously using versatape.
-
Personnel
-
Deflection of SFS not compromised by board fixings.
-
Personnel
Additional / bespoke items
-
Additional / bespoke items
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: