1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Wall Cladding - Micro Rib
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
STRUCTURE
-
Primary Structure handover complete.
-
Personnel
- Installer
- A2O
Storage
-
Store the material in dry protected conditions, never stacked more than two pallets high.
-
Personnel
- Installer
- A2O
Installation Checks
-
All end laps to have correct bubble gasket installed with no rips or tears / or continuous mastic seal to create air tightness.
-
Personnel
- Installer
- A2O
-
Once panels are installed all protective wrapping to be fully removed.<br>
-
Personnel
- Installer
- A2O
-
All panels to have AWP fillers or silicone plugs installed.
-
Personnel
- Installer
- A2O
-
Sheets to be fixed to every upright with 2nr fasteners per upright<br>
-
Personnel
- Installer
- A2O
-
All finishing top hats & inserts to have insulation installed behind<br>
-
Personnel
- Installer
- A2O
-
Tophats should have continuous mastic seal to both sides at junction of sheet face and top hat.
-
Personnel
- Installer
- A2O
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: