Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Built-up Wall Cladding
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
STRUCTURE
-
Primary structure handover complete.
-
Personnel
- Installer
- A2O
Storage
-
Store the material in dry protected conditions, never stacked more than two pallets high.
-
Personnel
Installation Checks
-
All liner panels to be fixed @ every corrugation @ eave joint & head and 3nr intermediately.
-
Personnel
- Installer
- A2O
-
Liner to have white foam filler installed @base & head and sealed wit mastic for air seal
-
Personnel
- Installer
- A2O
-
All side laps to have polyband mastic to air seal and gun grade mastic to laps.
-
Personnel
- Installer
- A2O
-
All spacer systems to be correctly interlocked and fixed at a minimum of 1nr per metre.
-
Personnel
-
Insulation to be continuous with no gaps, to ensure correct thermal qualities.
-
Personnel
- Installer
- A2O
-
Outer cladding to be fixed every corrugation @ base, joint & head + 3nr intermediately.
-
Personnel
- Installer
- A2O
-
Gun grade mastic to be installed to lap joint *** Horizontal cladding only
-
Personnel
- Installer
- A2O
-
Side laps to be stitched at no greater than @450c/c OR 1nr central between rails CA only.
-
Personnel
- Installer
- A2O
-
All required fillers to be bedded with mastic and set back from flashing edge.
-
Personnel
- Installer
- A2O
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: