Title Page

  • Site conducted

  • Audit Title

  • Project Name

  • Conducted on

  • Prepared by

  • Location
  • Instructions
    -------------------
    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link

Eurobond

  • Main Contractor:

  • Project Number:

  • Issued to:

  • QA Sheet No:

  • Elevation:

  • Level:

  • Comments:

Steel Frame

  • Check steelkwork is within tolerances : Column spacing as drawing, Column Level, Height, Datums marked by site engineer.

  • Personnel

  • Structural fixings as drawings and specification.

  • Personnel

Primary Seals

  • Air/water tight seamseal applied between base track and underside of base track with hammerfixings at 600mm centres. <br>

  • Personnel

  • 90x12mm continuous rubber air seal gasket installed to columns.

  • Personnel

  • 12x6mm continuous rubber air seal gasket around window and door openings. Seam seal mastic where appropriate.

  • Personnel

Panels

  • Check that panels are un-damaged as they are removed from pallets and that there is no sigificant colour variation. <br>

  • Personnel

  • Panel are properly engaged into each other and horizontal joints aligned with adjacent panels. <br>

  • Personnel

  • Panels installed with minimum 3nr fixings at end of each panel.

  • Personnel

  • Check depression around panel fixings does not spread over a diameter of more that 100mm. <br>

  • Personnel

  • Protective film to be removed from panel faces prior to installation (unless instructed otherwise by client).

  • Personnel

  • All gaps between panel joints to be fully packed with either loose rockwool (min 23kg/m3 density) or fire rated canister grade foam.

  • Personnel

  • Head of top panel to be stitched fixed at 450mm horizontal centres. <br>

  • Personnel

Flashings and Secondary Seals

  • Horizontal base drip cover flashings to be installed with rivet or torx head screws at miniumum 450mm centres. Miniumum 60mm wide profiled butt straps to be sealed behind each flashing.

  • Personnel

  • 9x3mm continuous butyl tape applied between flashing and panel to prevent water ingress.

  • Personnel

  • Vertical joint and corner flashings to be fixed to panel with rivet or torx head screws at minimum 450mm centres.

  • Personnel

  • Profiled butt straps present at flashing joints. <br>

  • Personnel

Completion

  • Installer Signature:

  • A2O Signature:

  • Client Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.