Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Render
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
Render
-
Starter track fixed correctly and level. Fixings at 300mm centres.
-
Personnel
- Installer
- A2O
-
Fire barriers (if required) installed to manufacturers recommendations and compliant with envirowall render
-
Personnel
-
Insulation (if required) installed using the correct number of fixings as per manufacturer requirements.
-
Personnel
- Installer
- A2O
-
All beads are plumb and square
-
Personnel
- Installer
- A2O
-
Reinforcing coat including mesh is installed as per envirowall details, including stretch patches around all openings.
-
Personnel
- Installer
- A2O
-
Base coat is installed to the correct depth and flat.
-
Personnel
- Installer
- A2O
-
Primer has been applied to all of the base coated areas.
-
Top colour coat is the correct colour and application is consistent in texture.
-
Personnel
- Installer
- A2O
-
Personnel
- Installer
- A2O
-
All areas are clear and clean of excess materials to prevent staining / damage to finished render.
-
Personnel
- Installer
- A2O
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: