Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Structural Framing System
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
Structure / Materials
-
Primary Structure handover complete.
-
Personnel
- Installer
- A2O
-
Materials checked against A2O construction drawings
-
Personnel
- Installer
- A2O
Setting out checks
-
Dimensions from grid checked
-
Personnel
- Installer
- A2O
-
Line and levels checked, openings set out correctly and sizes correct.
-
Personnel
- Installer
- A2O
Fixing checks
-
SFS Fixings to metsec install guide
-
Personnel
- Installer
- A2O
-
Track fixings correct to metsec drawings
-
Personnel
- Installer
- A2O
-
Jamb fixings correct and to metsec design
-
Personnel
- Installer
- A2O
-
Edge distance to fixing as per manufacturer guidelines
-
Personnel
- Installer
- A2O
-
Special constructions fixings to metsec standards
-
Personnel
- Installer
- A2O
SFS construction checks
-
Deflection tolerance at head constant & to metsec design
-
Personnel
- Installer
- A2O
-
Edge bearing observed, zed bars installed as required.
-
Personnel
- Installer
- A2O
-
Jamb construction to metsec design
-
Personnel
- Installer
- A2O
-
Lintel construction to metsec design
-
Personnel
- Installer
- A2O
-
Cill construction to metsec design
-
Personnel
- Installer
- A2O
Additional / bespoke items
-
undefined
-
Add media
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: