Information

  • Site conducted

  • Month/Document No.

  • Main Contractor

  • Site

  • Elevation assessed & works completed.

  • Location
  • Conducted on

  • Prepared by

  • Persons Carrying out work to Area being Accessed

  • Elevation/Grid reference of area inspected.

  • Add media

  • Completed by Subcontractors:

Part A. SFS Metsec

  • 1. Is the cement particle board in good condition, showing no signs of damage?<br>

  • Add media

  • 2. Are the CP boards installed correctly to manufacturers specification and recommendations?<br>

  • Add media

  • 3. Is the EPDM across the movement joints at floor slab levels in good condition?<br>

  • Add media

  • 4. Are all CP board fixing centers in accordance with manufacturers specification?<br>

  • Add media

  • 5. Are all CP joints taped or filled and sealed in accordance with manufacturers specification?<br>

  • Add media

  • 6. Is the area of existing boarding left in a clean and tidy condition?

  • Add media

  • 7. Have any remedial works been agreed and competed?

  • Add media

  • 8. Has the area of existing CP board been inspected by both A2O and the client project manager?<br><br><br><br>

  • Add media

Inspection result/comments.

  • undefined

  • Signed off by Contract Manager

  • Signed off by Main Contractor

  • Signed off by Project Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.