Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Guidance; This inspection report is carried out in order to, ensure that the A2O Fire Barrier quality assurance plan and the processes pertained within, are being followed by both A2O and site managements through the duration of the project. The purpose of the inspection is to ensure that A2O's robust system of quality checks are being met and all elements of the works have gone through the required stages of installation, inspection and sign off by both A2O site manager and our clients site manager as set out in each sites specific Fire Barrier QA Plan.
QA Checker Audit
-
Main Contractor:
-
Project Number:
-
Issued to:
-
Level:
-
Date/Time
-
Comments:
Pre-start checks
-
Have Fire Barrier Plan and specification been issued by client?
-
Are fire barrier construction issue drawings issued and available for inspection?
-
Are supplier installation guided issued and available for inspection?
Fire Barrier BRE QA Plan
-
Has Fire Barrier QA Plan been reviewed and signed off and approved by A2O senior management?
-
Does client have any special FB requirements?
Training
-
Has Fire Barrier training been arranged with the product supplier?
-
Have periodic inspections and final sign off inspection been arranged with the product supplier, and hold points marked on A2O Construction programme?
Materials
-
Are all fire barrier materials stored in accordance with supplier/manufacturers recommendations?
-
Have all Fire Barrier materials been checked against schedules and delivery notes?
-
Are all Fire Barrier materials stored safely in a designated and agreed lay-down area, under cover and sheltered from the elements, in a manner to minimize risk of damage?
Fire Barrier site installation QA
-
Are QA inspections being carried out in accordance with the agreed Quality Plan?
-
Do inspections cover all aspects of the fire barrier installation works and enable complete identification of all fire barriers.
Live Site Check
Element 1
-
Element
-
Materials
-
Installation
-
Drawing Information
Elemant 2
-
Element:
-
Materials
-
Installation
-
Drawing Information
Elemant 3
-
Element:
-
Materials
-
Installation
-
Drawing Information
Completion
-
Installer Signature:
-
A2O Signature: