Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Aluminium Rainscreen
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
STRUCTURE
-
Has handover documentation been issued by Main Contractor?
-
Personnel
- Installer
- A2O
Tyvek
-
Fire curbTyvek membrane installed and sealed with correct overlaps [Vertical 150mm and 100mm horizontal overlap.
-
Personnel
- Installer
- A2O
-
Tears and splits repaired and fully taped min 100mm overlap.
-
Personnel
- Installer
- A2O
Installation
-
Check fire barrier from previous inspection has not been damaged or dislodged.
-
Personnel
-
Existing Brackets have been re-secured with new fixings, new positions, or larger diameter within the same hole.
-
Personnel
- Installer
- A2O
-
Insect mesh secured to he face of the aluminium bracke.
-
Personnel
- Installer
- A2O
-
New aluminium feature flashing installed with colour coded rivets, in accordance with A2O design specification.
-
Area left clean and tidy with all hand marks cleaned from the flashing.
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: