Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Suspended Timber Soffit
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
STRUCTURE
-
Primary Structure handover complete.
-
Personnel
- Installer
- A2O
Storage
-
Once delivered to site, the plastic wrapping to the timber pallets should be removed from the sides of the pallets, leaving only the top plastic in place if pallets are stored outside, allowing the timber to breath and acclimatise whilst awaiting installation.
-
Personnel
- Installer
- A2O
Sub-Straight
-
Check sub-straight brackets and battens have been installed in accordance with design specification, inspected and signed off prior to installing any timber finishes.
-
Personnel
- Installer
- A2O
-
Check gridlines are in accordance with construction issue information and datums have been provide by site engineer.
-
Personnel
Timber Cladding.
-
Is timber type correct?
-
Personnel
-
Check batten dimensions and fix EPDM tape to back face.
-
Personnel
- Installer
- A2O
-
Check battens dimensions and orientation are as design specification; chamfered sides are correctly located to allow rain run-off if applicable.
-
Personnel
- Installer
- A2O
-
Insect mesh installed covering whole elevations between vertical and horizontal battens
-
Personnel
- Installer
- A2O
-
Battens fixed in accordance with construction issue design specification and fixed with specified fixings.
-
Personnel
- Installer
- A2O
-
Spacing of timber correct with fins every 600mm.
-
Personnel
- Installer
- A2O
-
Fixings and timber joints correct and as per A2O working drawings.
-
-
Installation snagged and DE snagged.
-
Personnel
- Installer
- A2O
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: