Information
-
Audit Title
-
Site/project
-
Conducted on
-
Prepared by
1. LOTO Electrical and Mechanical
-
1.1 Review of logbooks?
-
1.2 Energization and testing policy?
-
1.3 Commissioning procedure?
2. Housekeeping
-
2.1. Construction debris being removed? (Garbage)
-
2.2. Cleanliness of work area?
3. JHA Review
-
3.1. Long Form JHA reviewed?
-
3.2. Fall Protection Plan reviewed?
-
3.3. Minor JHA reviewed? (Orange Book)
4. Electrical
-
4.1. Ground Fault Circuit Interrupter (GFCI)
-
4.2. Electrical cord?
-
4.3. Cables?
-
4.4. Spider-box and C4?
-
4.5. Assured grounding program?
5. Personal Protective Equipment (PPE)
-
5.1. Lack of, or inadequate PPE (including sun protection)
-
5.2. Lack of system to issue, inspect, replace and monitor PPE?
-
5.3. Lack of training in safe use, clean-up and inspection of PPE?
6. Walking and Work Surfaces
-
6.1. Tripping hazards?
-
6.2. Slippery surfaces?
-
6.3. Floor openings and holes?
-
6.4. Ladders?
7. Electrical Tools
-
7.1. Guards in place?
-
7.2. Good condition?
-
7.3. Stored properly?
8. Crane (documentation)
-
8.1. Rigging equipment inspected?
-
Reviewed "On The Spot Lift Plan" (Yellow Book)
9. Access & Egress
-
9.1. Ladders secured and positioning?
-
9.2. Ramps?
10. Hot Work
-
10.1. Task specific PPE?
-
10.2. Combustibles removed from area?
-
10.3. Flammables protected fire blankets being used?
-
10.4. Fire extinguisher excess-able?
11. WHMIS
-
11.1. MSDS binder on project and accessible to workers?
-
11.2. Product (Supplier) Labels attached and legible?
-
11.3. Materials stored correctly?
12. Scaffold System
-
12.1. Fully assembled?
-
12.2. Inspection tag attached and dated?
-
12.3. Fully blanked and cleated?
-
12.4. Proper guardrail (top, mid and toe board)?
13. Proper barricades
-
13.1. Yellow or red chain and barricade tag attached?
-
13.2. Miscellaneous warning signs as per site conditions?
Comments and corrective actions?
-
Comments or action taken?
Sign Off
-
On site representative
-
Safety Coordinator signature