Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Aluminium Rainscreen
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
STRUCTURE
-
Has handover documentation been issued by Main Contractor?
-
Personnel
- Installer
- A2O
Membrane
-
Tyvek membrane installed and sealed with correct overlaps [Vertical 150mm and 100mm horizontal overlap.
-
Personnel
- Installer
- A2O
-
Tears and splits repaired and fully taped min 100mm overlap.
-
Personnel
- Installer
- A2O
Membrane signed off
-
A2O manager
Installation
-
Rockwool Dou slab installed in accordance with manufacturers specification.
-
Personnel
-
Fischer aluminium top hats secured to SFS framing FPH [4 x tec screws] SPH [2 x tec screws] per stud?
-
Personnel
- Installer
- A2O
-
Fischer WH100 [2 x screws] and WH100/160 [4 x screws] to helping hand brackets to aluminium top hats in accordance with manufacturer and A2O design specification.
-
Personnel
- Installer
- A2O
-
Aluminium rails fixed to helping hand brackets in accordance with manufacturer and A2O design specification.
-
Installation of Rockwool Duo slab between Fischer top hats [1 x non combustible fixing per sheet]
-
ACM Secured to vertical rail with colour coded rivet, in accordance with A2O design specification.
-
Insect mesh installed to top and bottom of ACM panels, where it meets feature channel.
-
Area left clean and tidy, with all hand marks cleaned from panel faces.
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: