Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Mech-Slip Rainscreen
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
STRUCTURE and preceding trades
-
SFS support and Versapanel Board complete.
- Checked
- Hold
-
Personnel
- Installer
- A2O
-
-
EPDM installed correctly.
- Checked
- Hold
-
Personnel
- Installer
- A2O
-
Tyvek Firecurb Membrane
-
Correct membrane installed and sealed using the correct tape.
-
Personnel
- Installer
- A2O
-
Tears, splits or holes repaired and fully taped min 100mm overlap.
-
Personnel
- Installer
- A2O
Support Grid
-
Fixed and sliding point brackets spaced vertically/horizontally and fixing arrangement in accordance with working drawings using stainless steel tek fixings.
-
Personnel
- Installer
- A2O
-
Vertical T and L rails positively fixed to fixed point brackets using stainless steel rivet/tek fixings.
-
Personnel
- Installer
- A2O
-
Vertical T and L rails fixed to sliding point brackets through slotted holes to facilitate movement.
-
Personnel
- Installer
- A2O
-
Horizontal movement joint included at slab level.
-
Personnel
- Installer
- A2O
Rockwool Insulation
-
Insulation fixed in accordance with A2O working drawings.
-
Personnel
- Installer
- A2O
-
Insulation joints and penetrations around brackets need to be butted tight with no gaps.
-
Personnel
- Installer
- A2O
Mech Slip Brick Slips
-
Horizontal support rails installed as manufacturers details, check the correct fixings have been used.
-
Personnel
- Installer
- A2O
-
Bricks fully clipped into rails and spacers installed to stop mortar from falling behind the bricks.
-
Personnel
- Installer
- A2O
-
Check for cracked and misshaped bricks.
-
Personnel
- Installer
- A2O
-
Vertical coursing plumb and consistent.
-
Personnel
- Installer
- A2O
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: