Title Page
-
Site
-
Started on
-
Inspected by
-
Subcontractor
-
Foreman
-
Works Certified
-
Completed on
PRE WORK CHECKS
-
DOOR SCHEDULE COMPLETE AND ON SITE
-
DETRIMINE FINAL FLOOR LEVEL
-
OPENING SIZES CORRECT
-
DETERMINE CORRECT FRAME FOR EACH OPENING
-
DETRMINE OPEN IN OR OUT
-
SITE CLEAN
DOOR FRAME INSTALATION
-
FRAME IN CENTER OF OPENING
-
INSTALLED TO CORRECT FFL
-
FRAME INSTAALED OPEN IN OR OUT
-
ADEQUATE FIXINGS USED
-
FRAMES PLUMB AND LEVEL
-
BRACING
-
PROTECTION
GENERAL
-
HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!
-
REQUIRED PPE
-
SAFETY FILE UP TO DATE
APPROVALS
-
SUBCONTRACTOR SIGNATURE
-
FOREMAN SIGNATURE