Title Page
-
Site
-
Started on
-
Inspected by
-
Subcontractor
-
Foreman
-
Works Certified
-
Completed on
PRE INSTALATION CHECKS
-
BRICKWORK DONE
-
APPROVED ROOF DESIGN DRAWINGS ON SITE
-
SITE CLEAN
STRUCTURE INSTALATION
-
RAFTER SPACING CORECT
-
RIDGES LINING UP
-
PERLINE SPACING CORECT
-
ROOF TIES SECURED
-
BRACINGS AS PER PLAN
-
VALLIES STRAIGHT
-
OVRHANGS CORRECT
-
INSULATION INSTALLED AS PER SPEC
-
INGINEER A19 ISPECTION
GENERAL
-
HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!
-
REQUIRED PPE
-
SAFETY FILE UP TO DATE
APPROVALS
-
INHINEER SIGNATURE
-
SUBCONTRACTOR SIGNATURE
-
FOREMAN SIGNATURE