Title Page
-
Site
-
Started on
-
Inspected by
-
Subcontractor
-
Foreman
-
Works Certified
-
Completed on
PRE INSTALATIN CHECKS
-
PLASTERING 1st PHASE DONE
-
ROOF RAFTERS INSTALLED
-
DETERMINE DOWN PIPE POSITION
-
SITE CLEAN
INSTALATION
-
LEVELS AND FALLS TO DOWN PIPES CORRECT
-
DOWN PIPES ON CORECT POSITIONS
-
DOWN PIPES PLUMB & LEVEL
-
ADEQUATE FIXINGS USED
GENERAL
-
HOUSEKEEPING – ONGOING, ALWAYS DO PRE WORK CHECK AND REPORT IF WORK AREA IS NOT CLEAN. AFTER WORK HAVE STARTED HOUSEKEEPING FOR WORK AREA IS YOUR RESPONSIBILETY!!!!!
-
REQUIRED PPE
-
SAFETY FILE UP TO DATE
APPROVALS
-
SUBCONTRACTOR SIGNATURE
-
FOREMAN SIGNATURE