Information
-
Finance Number
-
Project Title
-
Audit Date/Time
-
Project Manager
-
Prepared by
-
Contractor
-
Contractor's Representative
-
Site Location
Amenities / Housekeeping
-
Adequate facilities provided and cleared? (i.e. shelter, toilet, bins, drinking water)
-
Housekeeping (clear access egress, tidy site, sharp objects capped)
-
Public access & protection around site safe and suitable?
-
Mandatory signage adequate and clear? (min. PPE, emergency, Unitywater signage)
-
HAZMATsignage used?
-
Is their First Aid Kit and trained first aid responders on site?
H & S Documentation
-
Is the Project Management Plan on site and up to date?
-
H & S and emergency procedures visible? (i.e. fire, spills, medical, emergency H & S reps, first aid)
-
SWMSs for current tasks available on site and signed onto?
-
Risk Assessment up to date for all activities and signed off by workers?
-
All employess inducted? (induction records up to date and on site)
-
Register of hazardous substances kept on site?
-
MSDS sheets available to employees and used? (are materials used in accordance with MSDS)
-
Regular toolbox talks undertaken? (min. 1 per week, 1 per day preferred)
-
In-house audits completed?
-
Excavation permit / DBYD permit on site?
Employee Conduct / Exposure
-
Required PPE being worn by personnel?
-
Employees qualified and appear confident in assigned tasks?
-
Correct manual handling techniques?
-
Knowledge of OH&S requirements on site? (ask a few questiins of employees)
-
Employee exposure risk on site? (overexertion, falling objects, crushing, fall)
Plant / Excavations & Cranage
-
Daily plant inspection / checklists completed?
-
Safety devices fitted? (i.e. seat belts, fire extinguishers, reverse beeper, machine guards, beacons)
-
Excavations > 1.5m depth battered / shored / certified by qualified engineer?
-
Is spoil, plant and materials stored well away from the trench? (>1m)
-
Adequate fall protection, barracading and signage around excavation?
-
Has the structural integrity of buildings and other features been put at risk by the excavation?
-
Existing services protected? (i.e. DBYD on site, tiger tails on OH power lines, UG services located)
-
Slings / chains tested and tagged? (is the SWL marked, good condition etc. check a few, if no, is there a register on site)
-
Crane certification / licensed and current?
-
Qualified dog man?
-
Lifting plan completed for lift?
Electrical
-
Equipment tested and tagged? (check a few, if no, is there a register on site)
-
Are there any piggy-back leads / plugs or any leads suspended or crossing floors / water, causing trip hazards?
-
Earth leakage used on all tools / equipment?
Working at Heights / Scaffolding
-
Are risk assessments completed for work carried out on ladders, roofs or heights > 2m above ground?
-
Are ladders marked industrial uses and have a minimum SWL of 120kg?
-
Are suitable control measures implemented to prevent injury? (i.e. fall protection, edge protection)
-
Are openings / areas whereyou could fall >2m fended off?
-
Scaffolding over 4m errected by a licensed scaffolder?
-
Guardrails, mid-rails & toe boards installed with netting?
-
Scafftag fitted at all access points, current and legible?
Traffic Management
-
Is there a copy of the Traffic Management Plan located on site?
-
Has the Traffic Management Plan been approved?
-
If a main road, has approval been granted by Dept of Main Roads?
-
Is traffic being appropriately controlled?
-
Are the traffic controllers carrying their tickets on their person?
-
Is the TMP being followed?
-
If the TMP has been modified, was the authoriser level 3 or above?
-
Has adequate provision been made for pedestrians?
Accident & Incident Reporting
-
Have all accidents / incidents been reported to the Project Manager?
-
Have investigations been completed?
-
Have corrective actions been implemented?
-
Have risk assessments been reviewed for subsequent tasks?
Confined Space
-
Persons involved licensed / certified for confined spaces?
-
Valid permit and requirements complied with? (i.e. access, gas monitoring, isolation, housekeeping, ventilation, PPE)
-
Safe work procedures, SWMSs, MSDSs developed, attached to permit and complied with?
-
Correct signage in place "No Unauthorised Access", "Confined Space No Unauthorised Entry"?
Welding / Cutting / Grinding / Hot Works
-
Hot work permit completed?
-
Control measures in place? (i.e. fire extinguishers, PPE, welding screens)
-
SWMS completed and signed off by employees?
Signatures
-
Audit Completed by Signature:
Action Items
-
Action Items
Action Item
-
Corrective Action
-
Observation, Minor Non-Conformance, Major Non-Conformance
-
Due Date
-
Assigned To
-
Closed Out
General Comments
-
General Audit Comments