Information
-
Project Name & Number
-
Audit Date
-
Brief Project Description - Include Square Footage
-
Current Average Daily Manpower Broken Out by R&M Self Perform Employees & Subcontractors
-
Number of Subcontractors
-
Robins & Morton Self Performed Work
Administrative Audit
Demonstrated Management Commitment
-
1. Project Leadership Participates in New Employee Orientation (MIC & other supervisors)
-
2. Project Leadership Coducts/ Participates in Weekly Employee Safety Meeting
-
3. Project Leadership Participates in Incident Investigations
-
4. OSM 130 Safety Inspections Completed/Documented as Required, with folllow-up & Superintendent sign-off
-
5. OSM 130 On Site Safety Conditions Reviewed in Foreman's Meeting with Safety being a part of the Meeting Record
-
6. OSM 090 Employee/Supervisor Disciplinary Notices Documented / Violations Notifications
-
7. Insurance/Owner Audits Corrected and Documented
-
8. Response provided by Project for previous iAuditor Report with Subcontractor responses as required
-
9. Red Monkey Reports/Best Practices Discussed with Staff and Posted
Pre-Project & Pre-Task Planning
-
10. OSM 150 Daily Pre-Task Meetings Conducted with Adequate Content
-
11. MSDS Log Available & Up-to-Date
-
12. Current Robins & Morton Site Specific Safety Policy on Site and Available (Start Up Package)
-
13. Infection Control Documentation/Inspections available and Up-to-Date
-
14. Interim Life Safety (ISLM) Documentation/Inspections available and Up-to-Date
-
15. Asbestos Survey in Robins & Morton possession as required/Abatement Certification Letter
-
16. OSM 140 Crisis Management Plan (CMP) and Emergency Action Plan (EAP) Complete and Up-to-Date
-
17. Daily Inspections Documented (Forklift, Aerial Work Platform, Excavation, Scaffold, Skid Steer, etc...)
-
18. Fall Prevention/Protection System(s) Component Inspections Documented
-
19. Required Safety Submittals readily accessible per recommended Safety Filing System
Safety Education & Training
-
20. OSM 080 Required Orientations Held and Documented with Appropriate and Adequate Content
-
21. OSM 080 Specialty Training Conducted for Robins & Morton Employees with Appropriate and Adequate Content
-
22. OSM 080 Weekly Safety Meeting Conducted and Documented/Paperwork Complete
Employee Involvement
-
23. OM 170.1 Employee Daily Sign-Out
Safety Recognition
-
24. OSM 190 Recognition Program Implementation
-
25. OSM 195 Safety Lunch Completed and Documented
Subcontractor Management
-
26. OSM 060 Subcontractor Safe-Start Meetings Conducted and Documented
-
27. OSM 060 Subcontractor Safety Submittals Received/All Required
-
28. Subcontractor Included in Safety Meetings
Incident Investigation
-
29. OSM 100 and OSM 105 Incident Reports Submitted (lag time) (WC/GL)
Other
-
30.
-
31.
-
32.
Field Conditions
Field Conditions
-
1. Access (Elevations 19" or greater, into Building, Floor-to-floor, etc...)
-
Type of Access Observation Identified
- NC
- MNC
- NC
- MNC
- Compliant / Safe
- General Observation
- Discussion / Recommendation
-
Subcontractor
-
Location
-
Observation
-
Corrective Action Identified / Discussion
-
Corrective Actions Taken
-
Corrected?
-
2. Aerial Work Platforms
-
3. Elevated Deck -- Pearl Weave Fencing in addition to Temporary Guardrails
-
4. Body Position (Awkward Position, Repetitive Motion, Hand Placement, etc...)
-
5. Confined Space
-
6. Concrete (Forming System -- Engineered Design is Followed, Stripping/Shoring, etc...)
-
7. Crane/Hoisting Apparatus (Set-Up, Ground Conditions, Inspection, Qualified Riggers and Signalpersons, etc...)
-
8. Demolition/Renovation (Engineering Survey, Utilities De-energized, Protected)
-
9. Electrical Power (GFCI, Electrical Cords)
-
10. Environmental Issues Addressed (Spill Kits, SWPP, etc...)
-
11. Fall Exposures (Conditions, Passive, Perimeter Protection, Floor Holes, etc...)
-
12. Fall Hazard Control Systems (Active, Restraint, Anchor Points, Arrest, etc...)
-
13. Fire Protection
-
14. Flammable and Combustible Liquid Storage
-
15. Hand and Power Tools (Condition, Used Properly, Right too for the Job)
-
16. Hazard Communication (Container Labeling, SDS adhered to, Training)
-
17. Hazard Warning Signs in Place at Site Entrance/Specific Locations
-
18. Hazardous Energy Sources/ LOTO (Zero Energy State)
-
19. Heat/Cold Exposure Controls (Shade, Cool Zone, etc...)
-
20. Heavy Equipment (Use, Condition, etc...)
-
21. Housekeeping/Jobsite Cleanliness/Stored Material Organization
-
22. Hygiene Facilities (Toilets, Hand Washing, etc...)
-
23. Infection Control Measures (Negative Air Monitors, Inspection, Isolation, etc...)
-
24. Interim Life Safety Measures (ISLM) (Clear Exits, Signage, Alarms, etc...)
-
25. Ladders (Extension, Platform, Step)
-
26. Lighting (Adequate for Conditions)
-
27. Line of Fire (Struck by, Caught Between, Pinch Points, etc...)
-
28. Manual Material Handling (Mechanical Means First, < 50lbs, Awkward Material)
-
29. Masonry (Wall Bracing, etc...)
-
30. Material Handling (other than by crane) -- Rigging, Chainfalls, Come-a-Long
-
31. Personal Protective Equipment Utilization
-
32. Placement of Material to be Worked On (Vice, Stand, Secured, etc...)
-
33. Respiratory Protection
-
34. Scaffolds (Constructed Properly and Maintained/Green, Yellow, Red Tags)
-
35. Security and Public Protection
-
36. Stairway Access (Rails, Pans Filled Completely, Housekeeping)
-
37. Steel Erection (Erection, Decking, Structural Frame)
-
38. Temporary Power (Panels, Wiring, Condition, etc...)
-
39. Trenching and Excavations (Protected Properly, Egress Routes)
-
40. Water (Adequate Supply, Clean/Taped/Dated, Cups, Trash Receptacles)
-
41. Welding and Cutting (Bottles Secured/Stored, Leads, Flash Arrestors, etc...)
-
42. Work Zone/Traffic Control/Escort
-
43. Operator Certifications/Qualifications
-
44.
-
45.
-
46.