Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Pre-Audit Questions
-
Does the tech center agree that the equipment is ready for testing?
-
Have there been any previous reviews?
-
If yes, take a list of any actions and review them for completion.
-
Is PPE available for the tasks to be done? Ship or pack, if needed.
-
All parts and/or raw materials have been sent to factory?
-
All set points are available for initial trials?
Risk Assessment
-
Has the design risk assessment been completed?
-
If not, try completing the risk acceptance form.
-
Are there any hazards that stand out?
EH & S
-
What chemicals are needed with this equipment?
-
Any new chemicals?
-
If yes, obtain an MSDS.
-
Has the initial ergonomic assessment been completed?
-
If not, complete a BRIEF form.
-
What are the personal tasks for the required for the equipment?
-
Any ergonomic concerns that stand out?
-
What is the noise level with the equipment started up (idle)?
- > 85 dB
- 80 - 84 dB
- 70 - 79 dB
- 60 - 69 dB
- 50 - 59 dB
- 40 - 49 dB
- < 40 dB
- Not Applicable
-
What is the noise level while the equipment is running?
- > 85 dB
- 80 - 84 dB
- 70 - 79 dB
- 60 - 69 dB
- 50 - 59 dB
- 40 - 49 dB
- < 40 dB
- Not Applicable
Safety System
-
All guard doors easy to use?
-
Are guards in good condition?
-
Access to all areas that are needed?
-
Number of emergency stop buttons?
-
All emergency stop buttons in good location?
-
Is recovering from an emergency stop relatively easy?
-
Light curtains are protected?
-
Light curtains have the correct distance to prevent harm? Calculation available?
-
All openings not guarded, within acceptable distance range?
-
Any sharp points that need to be covered, removed or guarded?
-
All motors, gears, chains, belts, etc. guarded?
-
Any additional covering, guards, etc. necessary?
Operations
-
Go through all HMI screens.
-
What are the daily checks for operations?
-
What are the weekly checks for operations?
-
What are the monthly checks for operations?
-
What are the operating procedures needed?
-
What are the focal point procedures needed?
-
Any operational maintenance procedures?
-
All pictures taken for procedures?
-
Go through the startup process.
-
Go through the shutdown process.
-
Is an operating manual available?
-
General equipment pictures.
Equipment Run
-
Do the parts run through the system without trouble?
-
Are the parts cleaned?
-
Are any faults, easy to recover from?
-
Is there anything that we need to be sure to check when the equipment arrives?
-
What are the final set points in the machine?
-
Any other comments about the equipment run?
Maintenance
-
Are equipment drawings available?
-
Obtain a spare parts list.
-
Obtain a recommended PPM (planned preventative maintenance) list.
-
What is the serial number?
-
What is the make and model?
-
Any additional name plate information?
Setup
-
What are the setup tasks?
-
Go through the general setup tasks.
-
Any special tools required for setup?
-
Anything special about the equipment?
-
Is there any information that is needed for unloading or setting of the equipment?
-
Obtain pictures of all lift point, slots for fork truck, all connection points, etc.
Wrap Up Questions
-
Is there any thing you want to change about the equipment?
-
Is there any equipment that we need to purchase to use with this?
-
Are there any tools that need to be purchased?
-
Have all actions been documented?
Sign Off
-
Start Up Team
-
Manufacturing Representative
-
Project Engineer
-
Technology Center
-
Process Automation