Final Inspection Checklist for Cylinders
-
Has job number been stamped into component?
-
Are bearings lubricated and wrapped properly?
-
Has a JoyGlobal tag been attached to component?
-
Has part number, weight, job number, and Joy Global been stenciled onto component?
-
Have final photos been taken of component?
-
Has work scope been filled out and initialed?
-
Has acceptance testing been completed?
-
Is the prep, paint, and detail of the component up to JoyGlobal standards?
-
If bucket or hoist cylinder, are the large port covers installed?
-
Is the lip on the ball socket end in satisfactory condition? (Bucket and Hoist cylinders only)
-
Is the cylinder secured to the pallet?
-
Has the parts siting for job been added to the job pouch? (From warehouse area)