Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Final Inspection Checklist for Cylinders

  • Has job number been stamped into component?

  • Are bearings lubricated and wrapped properly?

  • Has a JoyGlobal tag been attached to component?

  • Has part number, weight, job number, and Joy Global been stenciled onto component?

  • Have final photos been taken of component?

  • Has work scope been filled out and initialed?

  • Has acceptance testing been completed?

  • Is the prep, paint, and detail of the component up to JoyGlobal standards?

  • If bucket or hoist cylinder, are the large port covers installed?

  • Is the lip on the ball socket end in satisfactory condition? (Bucket and Hoist cylinders only)

  • Is the cylinder secured to the pallet?

  • Has the parts siting for job been added to the job pouch? (From warehouse area)

Job information

  • Inspectors name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.