Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Final Inspection Checklist for Snub-Rites
-
Are bushings welded in fingers?
-
Sticker: Are they installed correctly?
-
Is relief adjustment screw cut off?
-
Is unit "EXPORTED PACKAGED" with a pallet that has lumber stamped with heat treated / kiln dried?
-
I.D. Plates: Are they marked according to job acknowledgement, including country code?
-
Is prep and paint up to acceptable quality standards?
-
Is door side properly marked with stencil and was yellow paint used?
-
Are test plugs removed from manifold?
-
Is there verification that testing has been performed?
-
Has the work scope work sheet been signed off?
-
Has parts list from warehouse / receiving area been added to job pouch?
-
Have final photos been taken?
-
Has unit been properly secured on a pallet, to prevent movement during shipment?
-
If unit has a cast arm is a new pin shipped with the snubber?
-
Has job number and country code been stamped in component?
-
Has a clear coat been applied to nameplate and pin bores (rust prevention)?
Job information
-
Inspectors name