Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Final Inspection Checklist for Production Snub-Rites
-
Sticker: Installed correctly?
-
Is unit crated with "EXPORTED PACKAGED" wood stamped with treated kiln dried?
-
Is the manual and warranty card placed in a plastic bag and in the crate?
-
I.D. Plates: Are they marked according to job acknowledgement?
-
Has a clear coat been applied to nameplate and pin bores (rust prevention)?
-
Is paint battleship gray and up to acceptable standards?
-
Is there verification that testing has been performed?
-
Has work scope been signed off?
-
Has parts list from warehouse / receiving area been added to job pouch?
-
Are new dual action internal manifold tags and I.D. On this unit?
-
Have final photos been taken?
-
Are bolts in arm shouldered out, or do they have lock washers?
-
Has country code been stamped in plate (US, AU, CA)?
-
Has unit been crated properly, blocked to prevent movement during shipment?
Job information
-
Inspectors name