Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Final Inspection Checklist for Production Snub-Rites

  • Sticker: Installed correctly?

  • Is unit crated with "EXPORTED PACKAGED" wood stamped with treated kiln dried?

  • Is the manual and warranty card placed in a plastic bag and in the crate?

  • I.D. Plates: Are they marked according to job acknowledgement?

  • Has a clear coat been applied to nameplate and pin bores (rust prevention)?

  • Is paint battleship gray and up to acceptable standards?

  • Is there verification that testing has been performed?

  • Has work scope been signed off?

  • Has parts list from warehouse / receiving area been added to job pouch?

  • Are new dual action internal manifold tags and I.D. On this unit?

  • Have final photos been taken?

  • Are bolts in arm shouldered out, or do they have lock washers?

  • Has country code been stamped in plate (US, AU, CA)?

  • Has unit been crated properly, blocked to prevent movement during shipment?

Job information

  • Inspectors name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.