Hand over procedure (BOARD ROTATION GUTTER FASCIA& ROOF EDGE PROTECTION)

  • Has the hand over been filled out correctly?

  • Add media

  • Has the scaffold tag been filled out and updated

  • Add media

Scaffold Checklist

  • Have all decks been lifted to the required height for gutter/ fascia installation and roof edge protection?

  • Has (1) one bay been lift 500mm higher for roof access?

  • Have all ledgers been installed and cup/wedges locked down with no movement?

  • Have all scaffold tie points been installed?

  • Standards are not protruding thought roof or blocking any part of the gutter installation ?

  • Have all lap boards been secured by the way of tex screwing or lashing ?

  • Add media

  • Are all transitions between deck levels no greater the 500mm?

  • Is the scaffold safe for use?

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.