Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Hand over procedure INSTALLATIONS

  • Has the handover been filled out correctly?

  • Photo

  • Is the scaffold tag filled out and attached to the entry of the stair access?

  • Photo

Scaffold Checklist INSTALLATIONS

  • Is the scaffold installed (4m)four meters from overhead powerlines ?

  • Are the sole boards benched correctly and are jacks centred to the sole board?

  • Is the stair/ladder access complete and secure (ladder secured in place)?

  • Is there access to all working platforms from the stair access ?

  • Are the gaps around the stair unit acceptable?

  • Is the step up to the stair access less than 500mm

  • Are all cups and wedges been locked and free of movement ?

  • Are all ledgers installed?

  • Are all transoms install?

  • BRACES (are braces installed every 3rd bay)?

  • STANDARDS (not blocking gutters and protruding though roof)?

  • STANDARDS Are standards blocking the electrical box?

  • Are decks installed at the correct height?

  • Are the transition between working decks no greater then 500mm?

  • BOARDS -Steel is each bay fully decked and set at the correct height?

  • BOARDS -Timber is each lapped section secured (Lashed or Screwed)?

  • Closed ends/ Scaffold boxed?

  • Are the Tube ties/Rakers bays in place?

  • Have the mesh panels or toe boards been installed?

  • Lower ledgers removed from access points ?

  • EXTRAS is the shade cloth/ chain mesh, (if installed )secure and installed correctly?

  • Is excess gear in stillages and stored in a safe location?

Handover

  • Is the scaffold safe to use

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.