Title Page
-
Report No.
-
Conducted on
-
Prepared by
-
Position
-
Signature
-
Document Ref.
Supplier Details
Supplier Details
-
Supplier Name
-
Supplier Address
-
Key Personnel
-
Current Approvals
- AS9100
- ISO9001
- ISO14001
- EASA Part 21
- EASA 145
-
Are copies of the certificates attached?
-
Scope of QMS approval
-
Who are the supplier's major customers?
-
What percentage of the supplier's business accounts for aerospace?
-
How many people does the supplier currently employ?
Approval Status
-
This supplier is approved to supply parts to Acro Aircraft Seating in accordance with the defined scope of QMS approval
-
This supplier is NOT approved to supply parts to Acro Aircraft Seating
Previous Audit Findings
-
SCAR 1
-
SCAR 2
-
SCAR 3
-
SCAR 4
-
SCAR 5
-
SCAR 6
-
Are all SCAR's from previous audit closed?
Audit Findings
Deficiencies
-
SCAR 1
-
SCAR 2
-
SCAR 3
-
SCAR 4
-
SCAR 5
-
SCAR 6
Observations
-
O1
-
O2
-
O3
-
O4
-
O5
-
O6
Quality Management System
-
Does the supplier have a documented QMS that is independently assessed and certified by a certification body?
-
Is the suppliers QMS assessed and certified to ISO 9001 as a minimum?
-
Does the supplier have a conformance matrix identifying that their QMS meets Acro Aircraft Seating's Supplier Quality Requirements document?
-
Does the supplier define the person(s) responsible quality?
Training and Competence
-
Does the supplier have a documented procedure for identifying training needs?
-
Does the supplier have a skills matrix?
-
Does the supplier maintain training records of personnel?
Control of Acro Aircraft Seating Documents
-
Does the supplier ensure they have the current revision of documents/specifications?
-
Does the supplier take appropriate action when document changes cannot be implemented prior to shipment of the product?
-
Does the supplier flow down Acro Aircraft Seating documents/specifications to sub-tier suppliers (when applicable)?
Control of Sub-Tier Suppliers
-
Does the supplier flow down all Acro Aircraft Seating requirements specified in SC-MAN-106?
-
Does the supplier maintain methods of qualifying and approving sub-tier suppliers and measuring their performance through the following indicators:
-
Audits?
-
Delivered Product Quality?
-
Customer Returns?
-
Delivery Schedule Performance?
-
Does the supplier have a receipt inspection process?
-
Is all supporting documentation provided with the purchased product that states the product meets the specified requirements? E.g. CofC, FAI
-
Does the supplier maintain records of receipt inspection?
-
Does the supplier maintain records of purchased product supporting documentation?
Raw Material
-
Does the supplier provide secure facilities to ensure raw material is not used until it has been inspected and verified as conforming to specification?
-
Is there a clear distinction between raw material quarantined and raw material accepted for use?
-
Are raw materials controlled to prevent loss of batch traceability and incorrect issue?
-
Does the supplier ensure that Acro Aircraft Seating specifically manufactured raw material is only used on its specific Acro Aircraft Seating order?
-
Is raw material stored and protected to prevent damage and deterioration or loss of identification and traceability?
Traceability
-
Does the supplier identify raw material/product by suitable means throughout production activities?
-
Does the supplier maintain traceability of all product during production (including product quantities, split orders and non-conforming product) for all stages of the manufacturing process?
-
Does the supplier differentiate between an unfinished product during sub-contract activities and finished product?
-
Does the supplier maintain identification of the configuration of the product?
-
Does the supplier maintain records of production?
Control of Measurement Equipment
-
Does the supplier operate a calibration system for all gauges and measurement equipment?
-
Are gauges and measurement equipment identified by a unique control number?
-
Does the supplier maintain calibration records of measurement equipment?
-
Is all personal measuring equipment controlled and calibrated?
-
Who conducts the calibration of the supplier's calibration equipment?
-
Is the calibration of equipment conducted in a suitable environment or by a certified UKAS lab?
Product Verification
-
Are the personnel performing product verification trained and competent?
-
Does the supplier use suitable measuring equipment for inspecting product to the defined requirements?
-
Have the personnel conducting inspection activities passed a yearly eye test?
-
Is product verification conducted in a suitable environment?
-
Are lighting conditions 500 lux or more in inspection areas?
-
Does the supplier perform visual inspection in line with acceptance standards?
Control of Non-Conforming Product
-
Does the supplier have a method for detecting and feeding back product non-conformities or process non-compliance?
-
Does the supplier contain non-conformities preventing them from delivery or unintended use?
-
Does the supplier complete containment actions within 48 hours of notification?
-
Does the supplier have a method of notifying the customer in the event of non-conforming product being shipped?
-
Does the supplier permanently identify scrap products until they can be physically rendered unusable?
-
Does the supplier maintain records of non-conforming product?
Rejections and Corrective Action
-
Does the supplier quote the relevant SCAR number on release documentation when returning previously rejected product?
-
Does the supplier conduct a problem solving activity to establish the root cause of non-conformities?
-
Does the problem solving activity detail corrective actions to eliminate the causes of the non-conformance?
-
Doe the supplier verify the corrective actions have permanently fixed the cause of the non-conformance?
-
Does the supplier flow down corrective action requirements to sub-tiers?
-
Does the supplier submit a SCAR when applying for concessions and production permits?
-
Does the supplier submit a SCAR when a non-conformance has been identified by a customer?
-
Does the supplier maintain records of SCAR's, problem solving activities and root cause analysis?
Production Permits and Concessions
-
Does the supplier flow down production permit and concession requirements to sub-tier suppliers?
-
Does the supplier quote the production permit and concession numbers on release documentation?
-
Does the supplier maintain records of production permits and concessions?
First Article Inspection
-
Does the supplier complete First Article Inspection in accordance with AS9102 requirements?
-
Does the supply carry out First Article Inspection in the following circumstances?
-
First supply of parts?
-
New drawing/part?
-
Change in production location?
-
Change in sub-tier or raw material supplier?
-
Significant non-conformance?
-
Change in manufacturing process?
-
Lapse in production of 2 years or more?
-
Drawing amendment?
-
Does the supplier maintain records of First Article Inspection?
Certification and Release
-
Does the supplier provide a CofC with delivered products?
-
Is the CofC signed by an authorised signatory?
-
Is the following information detailed on the CofC?
-
CofC number?
-
Supplier's name and address?
-
Customer's name and address?
-
Customer purchase order number?
-
Part number?
-
Part issue number?
-
Part description?
-
Quantity supplied?
-
Suppliers batch number?
-
Raw material specification?
-
Raw material batch number?
Preservation of Product
-
Does the supplier maintain the cleanliness of the product during manufacturing and storage?
-
Does the supplier prevent the presence of foreign object debris during manufacturing and storage?
-
Does the supplier provide secure storage facilities for products, equipment, tools and materials?
-
Does the supplier ensure the conditions of storage prevent deterioration and damage to stored items?
-
Does the supplier review the condition of stored product and planned intervals?
-
Are storage areas restricted to authorised personnel only?
-
Are stored products identified satisfactorily?
Retention of Records
-
Does the supplier have a method for the retention of records?
-
Can the supplier retrieve records within 24 hours when requested?
-
What method(s) does the supplier employ to retain records?
-
Where does the supplier keep records?
-
How long does the supplier keep records for?
-
Does the supplier notify the customer when disposing of records?