Title Page
-
Site
-
Development
-
Plot / Unit Address
-
Prepared by
-
Conducted on
-
Is power and water connected?
-
Does the unit appear complete and ready for inspection?
Entrance Door
-
Door number installed
-
Peep hole installed
-
Door closes and latches
-
Door stop installed
-
Decoration (visible marks/damage/thin paint/workmanship/top of doors painted etc)
Entrance Hallway, Stairs & Landings (use N/A for apartments)
-
Clean
-
Decoration
-
Flooring
-
Stair handrail securely fixed
-
Ceiling hatch fitted and lockable
-
Lighting
Living Room & Kitchen
-
Clean (surfaces/carpet/dust/windows/constructon debris & waste removed etc)
-
Decoration
-
Lighting
-
TV/Data points installed
-
Ranch slider(s) working (check lock)
-
Window restrictors fitted (check max 100mm opening)
-
Flooring - Carpet
-
Flooring - Vinyl
-
Curtains fitted
-
Heat pump installed & remote fitted
-
Kitchen worktops (check for scratches/marks etc)
-
Kitchen cabinets (any issues with drawers/cupboards?)
-
Under sink cupboard - child latches installed
-
Oven rangehood working
-
Anti-tip installed to stove
-
Water and drainage to kitchen sink
-
Any other issues or comment
Main Bathroom
-
Number of bathrooms
Bathroom
-
Clean
-
Decoration
-
Flooring (check vinyl welds)
-
Door closes & latches
-
Door stop installed
-
Basin (mixer, plug, seals etc)
-
Shower / bath / curtain (wetroom)
-
Water & drainage
-
Lighting
-
Extract fan (7 min overrun)
-
Blind or translucent glazing to window
-
Heater installed (accessible only)
-
Toilet roll holder installed
-
Towel rail(s) installed
-
Grab rail(s) (if applicable)
-
Cabinet safety latch fitted
-
Any other issues or comments
Bedroom
-
Number of Bedrooms
Bedroom
-
Clean
-
Door closes and latches ok
-
Door stop installed
-
Decoration
-
Flooring
-
Window restrictors fitted
-
Curtains fitted
-
TV/Data point installed (bedroom 1 only)
-
Electric heater installed and working
-
Wardrobe doors and fit out
-
Lighting
-
Any other issues or comments
Storage Cupboards
-
Number of Storage Cupboards
Store
-
Clean
-
Decoration
-
Flooring
-
Shelving Installed
-
Door closes & latches
Other Items
-
Hot Water Cylinder - 'No Scrap Value' Sticker
-
Hot Water Cylinder - Seismic Restraint Fitted
-
Supertub fitted to laundry
-
Chorus ONT Installed & Accessible (KOHC Prompt Only)
-
Smoke alarms installed
-
Smoke alarms are interconnected
-
Any other comments / observations
Externals
-
Shed installed
-
Letterbox installed
-
Clothes line installed
-
Light to entrances/balconies installed
-
Soft landscaping complete
-
Hard landscaping complete