Title Page
-
Conducted on
-
Prepared by
-
Site Entrance Location
-
Photo of Site Name and Location Number Plate
-
Sketch Layout of AGI and Location of Welfare, storage and Emergency Escapes.
-
Date Required
-
Is the work request for inside or outside the main compound?
- Inside
- Outside
-
Stand Next to the item to be removed and add GPS Co-ordinates....
-
Take Photo's of the Work Area, identifying height and width of the item to be cleared...
-
How high (approx) is the item to be cleared?
- <3 Metres
- >3 Metres but <10 Metres
- >10 Metres
-
How wide is the item to be cleared at its widest point?
- <3 Metres
- >3 Metres but <10 Metres
- >10 Metres
-
Tick if you believe a lifting plan will be required.
-
Can this work be done under a FOA or will a permit be required?
- Permit to Work (Via Risk)
- Form of Authority
-
How close to the inlet/outlet Pipelines is the scrub clearance?
- <3 Metres
- >3 Metres but <10 Metres
- >10 Metres
-
Please provide any information about Specific Site Hazards e.g. Site is on a fast Road, site is unsecure, Site is under an NRO etc etc