Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Service Visit Type
-
Location
-
Plant Description
-
Asset Reference
RAMS
-
Risk assessment completed
-
Method statement completed
-
PPE
-
Engineer Initials
SFG 20 Procedure - Adiabatic Cooler Inspection (6M)
Cooler unit
-
Check for dirt, damage and corrosion
Heat exchanger
-
Check for dirt, damage and corrosion
-
Check for leaks
-
Clean if required
Appearance Points
-
Cleanliness of the environment
-
Cleanliness drain channel
Spot check Points
-
Outside air temperature
-
Outlet temperature
Fans
-
Check for secure fit
-
Check for damage
-
Operating hours - please enter run hours for each fan
Temperature- and humiditysensor
-
Check that measuring instrument functions (note actual values)
-
Check measuring detector for dirt and damage
Pipework / Water supply
-
Check for dirt and damage
-
Check for secure fit (screw connections)
-
Check tube joints for tightness
Humidification pads
-
Check for dirt and damage
-
Clean if required
Additional Comments
-
Report of any faults
Safety checks
-
Inspection Completed
-
Area left safe
-
Area left clean