Information
-
Site conducted
-
Job number/Project name
-
Site Address
-
Supervisor Name
-
Conducted on
-
Location
The purpose of this safety audit is to ensure a safe working environment for all workers and to ensure all onsite contractors are aware of the Rivergum Homes site rules.
SITE DETAILS
-
Provide photo of construction stage of dwelling
-
Provide photo of site sign erected onsite.
WORK AREA - HOUSEKEEPING
-
Site general housekeeping (neat and tidy)
-
Internal Housekeeping (neat and tidy)
-
Walkways clear from clutter/debris and obstructions
-
Access to doorways and garages clear and unobstructed
-
Are there any visible risk/hazards evident
-
Have you completed a Hazard Inspection
-
Reason why a Hazard Inspection has not been completed
ONSITE SIGNAGE/QR CODE
-
Is the site management plan/layout displayed and easily accessible for the QR code.
-
Have the lifesaver/site rules been displayed for easy access?
-
Has the Emergency Assembly Point/First Aid/Emergency Contact list been displayed
-
Any comments to add for onsite signage/QR code
CONTRACTOR MANAGEMENT/PERSONNEL
-
Is there contractors onsite
-
Name of contractor
-
Is the contractor orderly and professional?
-
Has the contractor used the QR code?
-
Has the contractor provided a JSEA/SWMS for their scope of works
-
Have all the workers for the contractor read and signed the JSEA/SWMS
-
Take a photo of the contractors JSEA/SWMS
-
Does the Contractor have a JSEA/SWMS?
-
Has the contractor provided a copy of their relevant and current Insurance
-
Who has received the relevant and current insurance?
PERIMETER FENCING/PUBLIC PROTECTION - LIFE SAVER RULE 2
-
Has a "CONSTRUCTION SITE - DO NOT ENTER" signage been displayed
-
Is there perimeter boundary fence/hoarding in place
-
Is perimeter fencing/hoarding secured and safe from unauthorized access.
-
Add Photo of secure and safe fencing/hoarding
-
Are there access gates provided
-
Are access gates lockable and secured every night
-
Are all perimeter fencing/hoarding secured from adverse weather conditions (high winds)
TRAFFIC MANAGMENT - LIFE SAVER RULE 2 (CONT.)
-
Is there a Traffic Management plan in place
-
Is Traffic Management required for all works
-
Have the Traffic Management personnel the appropriate ticket
-
Are the Traffic Management personnel wearing appropriate Hi Vis
-
Are appropriate witches hats or bollards in place
-
Is the footpath required to be closed?
-
Has the appropriate footpath closed signage been displayed?
-
Is Traffic Management for a short duration period
-
Explain duration period Traffic Management is required.
PERSONAL PROTECTIVE EQUIPMENT PPE
-
Are all contractors onsite wearing Minimum PPE as per site requirement?
-
Photo of contractors onsite using adequate PPE
-
Are Covid-19 guidelines for PPE being observed by contractors
-
Have contractors onsite used the QR code to sign in.
HAZARDOUS SUBSTANCES
-
Is there any Hazardous Substance work or materials cutting onsite
-
Are contractors wearing the correct PPE for Hazardous Substance work
-
Name of contractor cutting Hazardous Substance materials.
-
Does the contractor have appropriate vacuum systems for cutting Hazardous Substance Material
FALL PROTECTION EQUIPMENT - LIFE SAVER RULE 1
-
Are there Ladders/Trestles being used onsite?
-
Are ladders a minimum of 4 steps (3 step ladders are banned on RGH sites)
-
Are Ladders/Trestles in good condition and free of defects.
-
Are ladders being used correctly (3 point of contact)
-
Are Ladders/Trestles industrial rated
-
Photo required
-
Are Perimeter Guard Rails in use?
-
Is the Perimeter guard rail in place before starting works to upper floor levels
-
Has the perimeter guard rail been signed off and tagged
-
Has the perimeter guard rail been tampered with?
-
Has appropriate ladder access been provided (if required)
-
Photo required
STAIR VOIDS
-
Are Stairvoids installed onsite
-
Have stairvoids been installed prior to works starting on 1st floor level?
-
Have the stairvoids been signed off and tagged?
-
Have the Stairvoids been tampered with?
-
Does the access ladder protrude 1 meter past the Stairvoids landing
-
Is the ladder in good condition and free of defects
-
Photo required
SCAFFOLD
-
Is there scaffold onsite?
-
Has the scaffold been signed off and tagged
-
Provide a photo of the tag
-
Has the scaffold been tampered with?
-
Explain how it has been tampered with, who is responsible.
-
Has appropriate ladder/stair access been provided
-
Are all decks free of rubbish and have clear access
-
Have SCAFFOLD INCOMPLETE signage been installed for unsafe or incomplete scaffold
-
Has a scaffold inspection been completed?
-
Why has the inspection not been completed?
ROOF WORK - LIFE SAVER RULE 1 (CONT.)
-
Is there any roof work being carried out onsite?
-
Have perimeter guard rail been installed prior to roof works commencing?
-
Photo of the guard rail sign off and tag if applicable.
-
Have appropriate access points been provided for roof access
-
Have appropriate access ladder been provided that exceeds 1 metre past the access point and is in good condition and tied off/secured.
ELECTRICAL - LIFE SAVER RULE 5
-
Is there any electrical work/equipment being used and/or live electrical works onsite.
-
Electrical equipment being used onsite have all been tested and tagged and tags clearly visible.
-
Photo of electrical equipment tag.
-
Are contractors onsite aware that live electrical works are not permitted at any time.
-
Are contractors onsite required to penetrate into any walls that may be live.
-
Has a tag out system/decommissioning procedure been implemented prior to penetrating live walls.
-
Are RCD boxes being used onsite?
-
RCD boxes being used onsite are compliant and as per regulations
-
Have the RCD boxes been tested and tagged (monthly Vic) & (3 months SA)
-
Are the RCD boxes in good condition
-
Are electrical leads in good condition and free of defects
-
Is there power close to the work area to avoid leads being piggy backed
-
photo of compliant RCD/electrical cords
OVERHEAD POWERLINES - LIFE SAVER RULE 5 (CONT.)
-
is there any work being carried out near overhead power lines?
-
Is a permit required for conducting works near overhead powerlines?
-
Has a permit been obtained
-
Permit Number
-
is an electrical spotter required for conducting works near overhead powerlines
-
Have DANGER OVERHEAD POWERLINES signage been displayed and bunting installed if works are permitted in proximity of overhead powerlines.
-
Photo of overhead powerlines/controls implemented
EXCAVATIONS - LIFE SAVER RULE 4
-
Are there any excavations being undertaken onsite.
-
Has a PERMIT TO EXCAVATE/DIG been completed prior to disturbing any ground.
-
Have all underground services been identified and marked up prior to disturbing any ground.
-
Are there any trenches greater than 1.5 meters in depth?
-
Has a mobile plant operating zone been established around the plant
-
Have appropriate benching - battering or shoring been put in place
-
Has appropriate access been provided for entering trenches
-
Will trenches be left open at the end of the day
-
have trenches been made safe by providing covers/para webbing/bunting off.
-
Photo of trenches being left overnight safe.
-
Has danger open/deep trench signage been displayed
-
Are all personnel working around excavators wearing Hi Vis and Hard Hats (if applicable)
HOT WORKS
-
Is there any hot works being undertaken onsite?
-
Has a HOT WORKS PERMIT been issued.
-
Are the requirements of the permit being observed by the contractor
TOOLS AND EQUIPMENT
-
Are there tools and equipment being used onsite?
- yes tools & Equipment are onsite
- No tools & equipment are onsite
-
Are all electric tools tested and tagged and in current date
-
Photo required
-
Are all tools in good condition and fit for purpose
-
Are all guards in place and in working order
-
Are contractors using the correct tool for the task
PLANT AND EQUIPMENT - LIFE SAVER RULES 3
-
Are there any plant and equipment being used onsite
-
Has the Plant and Equipment Checklist been completed
-
explain why a plant and equipment checklist has not been completed
-
Photo of the Plant and Equipment Checklist
-
Do the Plant Operators hold the appropriate HI RISK LICENSE or COMPETENCY for the Plant they are operating and is it current?
-
Has the Plant Operator completed a Prestart?
-
Have EXCLUSION ZONES been setup around the work area of the Plant?
-
Has the plant a functioning beacon/flashing light operating
-
Are safety pins in place where required for excavators
-
Please explain why an exclusion zone has not been set up.
-
Are all personnel working in and around the mobile plant wearing Hi Visibility clothing and Hard Hats as required
-
Photo of plant use/personnel/safety pins in place.
CRANES - LIFE SAVER RULES 3 (CONT.)
-
Is there a crane operating on site?
-
Has a Mobile Crane Checklist been completed?
-
Has the Crane Operator completed a Prestart?
-
Has a SWMS/JSEA been provided for the Crane Operator
-
Please provide a photo of the SWMS/JSA
-
Is the weather conditions satisfactory for crane operations?
-
Are maintenance/Inspection records available for the Crane and Lifting Equipment?
-
Please explain why the maintenance/inspection records are not availible.
-
Has the Crane a Safe Working Load (SWL) greater than 10 tonnes?
-
Has the crane been registered with the appropriate authority?
-
Has an EXCLUSION ZONE been set up around the crane and lifting area
-
Is the crane setup area away from Pits - Excavations - on Unstable ground
-
Are appropriate Bog Mats or Timber Blocks in place for the out riggers
-
Are the out riggers fully extended
-
Does the Crane operator hold the appropriate HI RISK license for the crane
-
Does the Dogman hold the required license
CONCRETE PLACEMENT
-
Is there a concrete boom pump on site?
-
Has the Concrete boom pump been registered with the appropriate authorities?
-
Has the Plant and equipment checklist been completed?
-
Are Maintenance/Service records available (including thickness test for the pipes)
-
Give reason why Maintenance/Service records are not available.
-
Does the operator hold the appropriate Hi-Risk license for the operation of the boom pump (PB)
-
Has a SWMS/JSEA been provided for Concrete Pump opertions?
-
Have all personnel signed off on the SWMS
-
Give reason why a SWMS/JSEA has not been provided.
-
Has the operator completed the prestart prior to commencing pumping operations?
-
Are the outriggers fully extended
-
Give reason why outriggers are not fully extended.
-
Are Hose clamps secured
-
Is the Hose tethered/secured to the boom?
-
is the Hose Operator wearing the required PPE whilst pumping?
- yes
- No
- N/A
Sign Off
-
Name & Signature of Site Manager