Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Framing

  • Is Framing Inspection Complete both by City Official and Structural Engineer?

  • Are all walls straight edged and planed?

Electrical

  • Electrical inspection has been performed and approved?

  • All Nail Plates are correctly installed?

  • Fire Protection has been installed around all conduit/MC cable above ceiling and walls?

  • All gypsum board in fire rated partitions due to due to electrical conduit/MC cable installation is free from damage?

  • Any and all blocking used by subcontractor is complete?

  • All boxes have the proper support ears for the partition type they are in, secure, and in the right location?

Plumbing

  • Plumbing inspection has been performed and approved?

  • All water lines have been tested?

  • Fire protection has been installed around all plumbing lines above ceilings in fire rated partitions?

  • All Plumbing lines are strapped correctly

  • All nail plates are correctly installed?

  • All gypsum board in fire rated partitions due to piping installation is free from damage?

  • Any and all blocking used by subcontractor is correctly installed?

Sprinkler

  • Sprinkler inspection has been performed?

  • All penetrations through fire rated partitions above ceiling level have had fire protection installed?

  • All sprinkler lines ave been tested?

  • All sprinkler heads have been capped off?

  • Water has been placed into the system, tested at 200 PSI for 2 hours and holding?

HVAC

  • HVAC inspection has been performed?

  • All penetrations through fire rated partitions above ceiling level have had fire protection installed?

  • All duct penetrating the exterior walls have been properly sealed?

  • All duct supply drops and returns are in the correct area?

  • All Flex Duct is properly secured?

  • Line Sets are Run and tested?

  • All condensate Drains are slopped and completed?

Low Voltage

  • Low voltage inspection has been performed?

  • SOHO Box is installed and in proper location

  • All penetrations are properly fire sealed?

  • All boxes are in the correct location and secure?

  • All gypsum board in fire rated partitions due to wiring installation is free from damage?

Insulation

  • All Rock Wool is in place for fire blocking on Party Walls?

  • All Rock Wool is in place on Plumbing Walls where needed?

  • Rock Wool is in place under Tub Drain?

  • All Insulation in Ceiling and Walls are installed with Proper R Value?

General

  • All trade inspections have been accounted for?

  • All blocking and/or strapping in fire rated partitions is fire rated wood?

  • All windows have been waterproofed?

  • Unit is Broom Clean and Ready for D/W

Review

  • Follow up Notes

  • Plumbing Contractor Signature

  • Select date

  • Electrical Contractor Signature

  • Select date

  • HVAC Contractor Signature

  • Select date

  • Low Voltage Contractor Signature

  • Select date

  • Sprinkler Contractor Signature

  • Select date

  • Drywall Contractor Signature

  • Select date

  • Adolfson and Peterson Representative Signature

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.