Information
-
Document No.
Work Details (Completed by Employees in charge of work)
-
Date of Issue:
-
Time:
-
Site/Depot:
-
Work location:
-
Name of person issuing permit:
-
Person in charge of Hot Work:
-
Description of Hot Work:
Precautions (Completed by person in charge of work)
-
General Area (The following criteria must be met within 10 meters of the hot work area)
-
Floor clear of combustibles<br>
-
Combustible floors wet down or covered
-
Area clear of flammable materials including gas, liquid and dust
-
Wall or floor openings covered<br>
-
Area beneath work protected from flames, sparks and molten material
-
Wind from open doors, windows, fans and air conditioners eliminated<br>
-
Relevant services isolated (e.g. electricity, gas, water, air and hydraulic)<br>
-
Work on walls, floors and ceilings
-
Verify walls, floor, ceiling and insulation is not combustible
-
Equipment
-
Flash-back arrestors fitted to welding equipment
-
Welding equipment earthed as close as possible to object being welded
-
Electrical equipment in good order with current inspection & test tag attached
-
Power leads stowed away and not subject to damage
-
Appropriate PPE available
-
Fire Fighting
-
Appropriate fire extinguisher and/or hose reel available in immediate work area
-
Work area observed for 30 minutes after completion
-
Qualifications & Training
-
Persons conducting the hot work are suitably qualified and experienced
Authorisation (Completed by Permit Issuer)
-
Permit Validity: The duration of the hot work permit must not exceed more than one (1) day, after which a new permit must be issued
-
From Date and To Date:
-
From Time and To Time:
-
Name of Permit Issuer:
-
Signature of Permit Issuer:
Commencement (Completed by persons performing the hot work)
-
Sign-on upon commencement of work
-
-
Date:
-
Time:
-
Sign-off upon completion of work
-
Add signature
-
Date:
-
Time:
Completion (Completed by Permit Issuer)
-
Name:
-