Information

  • Report Reference Number:

  • Site Name/ Location:

  • Client

  • Conducted on

  • Inspected by:

  • Accompanied by:

  • Scoring.

    N/A = This item was not applicable at the time of the inspection, or it was not one of the items inspected.

    S = Satisfactory. This category was being managed / controlled in accordance with minimum requirements or better.

    A = Advisory. Recommended measures necessary to achieve industry best practice.

    IAR = Immediate action required to reduce the risk of harm and/or enforcement action.

Accidents, Dangerous Occurrences or Near Misses since last visit.

  • Number recorded. :- Provide details.

0 Previous Inspections.

  • Has previous inspection been satisfactorily addressed/ Closed out.

  • Recommended Actions.

1 Scaffolds and Mobile Towers

  • Designed /TG20 compliance sheet- hand over certificates- erected in accordance with recognised standards SG4- statutory inspections carried out etc.

  • Recommended Action.

2 Ladders, Stepladders, Podiums etc.

  • Fit for purpose - in good order - secured - inspected etc.NMAE

  • Recommended Actions.

3 Demolition.

  • Demolition plan in place - work carried out in accordance with plan etc.

  • Recommended Action.

4 Excavations & Groundworks.

  • Safe digging practices- supported/battered - statutory inspections - access/egress etc. No dig technology

  • Recommended Action.

5 Lifting Operations.

  • Lifting plan -Appointed Person and Duty holders- testing/certification - ground conditions - SWL, Temporary Works etc.

  • Recommended Action.

6 Mobile Plant & MEWPs.

  • Fit for purpose - tested/inspected - Anti crush technology- TW pile mat.

  • Recommended Action.

7 Portable Tools.

  • PAT - fit for purpose etc. Reduced voltage, Battery operated.

  • Recommended Action.

8 Access/egress.

  • Adequate - maintained in good order, Pedestrian segregation, barriers and signage in place?

  • Recommended Action.

9 Electricity

  • Inspection/test - isolation/lock off - 110v- permit to work/ Liven up- Competent persons.

  • Recommended Action.

10 Environmental.

  • Waste management plan, WTN/ Consignment Note recorded - spill kit and procedure - noise - dust - mud controls/ suppression etc.

  • Recommended Action.

11 Hoarding/ Fencing/security.

  • Adequate - maintained etc.- Hoarding- temporary works design, inspected?

  • Recommended Action.

12 Subcontractor Management.

  • Co ordinated - supervised, RAMS, Competency,

  • Recommended Action.

13 Personal Protective Equipment.

  • Fit for purpose - Hard Hat, Hi-Viz, Gloves, Safety footwear, Eye protection,RPE,face fit tested.

  • Recommended Action.

14 Edges/openings/stairways- W@H

  • Are all edges Adequately guarded - inc. handrails on stairs, Risers, shafts - Are stairs unobstructed and safe to use?

  • Recommended Action.

15 Site Good Order

  • Housekeeping standards - Is site clean and tidy? slips/trips/falls prevention - suitable lighting etc.

  • Recommended Action.

16 Fire Precautions.

  • Site Fire plan in place - Emergency alarm points on site - Escape signage - Fire extinguishers in place, Tested/inspected - exit routes - Emergency muster point - control of flammable substance etc. compliance with Fire Safety in Construction- JCoP, Fire safety Act and Regulations?

  • Recommended Action.

17 Occupational Health

  • Are suitable Occ health systems and controls in place? Noise - HAVS - MSDs - Dermatitis etc. Occ health monitoring procedures implemented?

  • Recommended Action.

18 Welfare

  • Sufficient facilities in compliance with CDM- adequately equipped - suitably maintained in good order?

  • Recommended Action.

19 First Aid

  • Nearest A&E hospital location detailed on noticeboards - Site first aiders identified - first aid equipment on site.

  • Recommended Action.

20 Competency

  • Site inductions completed? - tool box talks - training. CSCS cards/ certificates checked for Subcontractors?

  • Recommended Action.

21 Documentation

  • Construction Phase Plan - Pre Construction information - statutory notices displayed?

  • Recommended Action.

22 Asbestos.

  • Survey report - management plan/ R+D survey - Removal and disposal RAMS and contractors appointed - licensed work - Asbestos Awareness etc

  • Recommended Action.

23 Safe Systems of Work

  • Subcontractor Method Statements - COSHH - Risk Assessments - Permits etc.

  • Recommended Action.

24 Traffic Management

  • Traffic plan - segregated routes - routes maintained - signage etc.

  • Recommended Action.

25 Temporary Works

  • Designed - co ordinated etc. TW plan and Register- TWC appointed

  • Recommended Action.

26 Worker Engagement & Consultation

  • Arrangements, evidence. Meeting minutes recorded.

  • Recommended Action.

  • Overall Comments:

  • Site Manager Action / Comments:

  • Advisor

  • Actions taken to address shortfalls.

  • Closed Out by and date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.